Laserfiche WebLink
<br /> <br />STATEMENT OF QUALIFICATIONS <br />RESUMES <br /> <br /> <br />EDUCATION <br />B.S. in Mechanical Engineering, Florida International <br />University, 1980 <br />All State Construction College <br />Construction Management, 1979 <br />University of Miami, Architecture, 1977 <br />Louisiana Tech., Commercial Art, 1969 <br /> <br />LICENSES <br />Florida Certified General Contractor, CGC018337 <br />Montana Certified General Contractor, 1986 <br />New Jersey Certified General Contractor, 1989 <br /> <br />RESPONSIBILITIES <br />His primary function is to provide overa~1 ma~age~ent <br />direction and administration for the project, Including: <br />(1) initiate and maintain liaison with FlU in order to e~se <br />construction activities; (2) Monitor/control construction <br />through administrative direction of project manager and <br />superintendents; and (3) Establish project objectives, <br />policies, procedures and performance standards. <br /> <br />Additionally Fernando will be responsible for the overall <br />management of project, which includes management <br />and supervision of the production of all contract <br />administration documents including requests for <br />information; shop drawings log; change order requests, <br />coordination and correspondence to architects and <br />engineers, owners and subcontractors; schedule tracki~g <br />and identifying problems and potential problems with <br />plan specifications and subcontractors, among others. <br /> <br />EXPERIENCE <br />Responsible for over 250 projects ranging in a wide variety <br />of educational, commercial, institutional, industrial and <br />custom residential experience encompassing both new <br />structures and rehabilitation of historical facilities. The <br />gamut of experience includes masonry reinforced concrete, <br />steel superstructure and modular construction. Most of <br />the projects required estimating, bidding and negotiations <br />in addition to general coordination and supervision; cost <br />estimates; enforcement of quality control; client negotiations <br />and dealings with private or public sector agencies. <br /> <br />Fernando's relevant project experience in a supervisory <br />capacity includes the following: <br /> <br />Sunny Isles Beach Community K-8 Center, Sunny Isles, <br />FL - CM-at-Risk of a new Multi-story K-8 Facility designed to <br />house 1,642 student stations, on 2.1 acres One of the key <br /> <br /> <br />components of the project <br />was a multi-story parking <br />garage constructed on <br />pilings and grade beams in <br />a coastal environment. The <br />parking garage included <br />an elevator and occupied <br />areas at ground level, with <br />physical education and <br />custodial uses. <br /> <br />Westland Hialeah Sr. <br />High School, Hialeah, <br /> <br />FL - Design-Build of a new Senior High School complex <br />composed of multiple buildings, EHPA and courtyards to <br />house 1,839 student stations (322,084 SF). One of the key <br />components of the project was a multi-story, 150-space, <br />cast in place parking garage <br /> <br />Country Club Middle School, Miami Lakes, FL - Design- <br />Build of a new Middle school facility including 3 buildings. <br />A multi-story classroom building, Media Center, single story <br />Cafetorium/Kitchen building and Administration Building. <br /> <br />Norma B. Bossard ES, Miami, FL - This $18 MM Design- <br />Build project consists of the construction of a new 102,348 <br />SF elementary school facility including 3 buildings. <br /> <br />Coral Park Senior High School, Miami, FL - This Design- <br />Build project consisted of 170,OqO SF state of t~~ art <br />facility including offices, food service, labs and traditional <br />classrooms. <br /> <br />'" <br />go <br />5 <br />'" <br />Jackson Memorial Hospital Parking Garage, Miami :W <br />Beach, FL - Construction of a new Parking Garage, 5 stories ~ <br />in height with the capacity to expand 2 more stories for a ~ <br />total of 7. 'i <br />.~ <br />:z::: <br />'" <br />~ <br />'" <br />'" <br />.~ <br />'" <br />c <br />'" <br />';:; <br />~ <br />.9 <br />~ <br />.~ <br />'0 <br />D: <br /> <br />EMPLOYMENT <br />1993 to Present MCM LLC., Vice President <br />Miami, Florida <br />1988 to 1993 Kitchen & Associates Architects <br />Associate & Sr. Project Manager, <br />Westmont, New Jersey. <br />1986 to 1988 Alpha & Omega Construction Company, <br />President <br />Bozeman, Montana. <br />1979 to 1986 Brothers Construction Company, <br />President, Miami, Florida <br /> <br />~ <br />:;i: <br />o <br />ci <br />z: <br />~ <br />"'" <br /> <br />. <br />