Laserfiche WebLink
<br /> <br />CITY OF SUNNY ISLES BEACH ~ <br /> <br />SAFETY MANAGER <br />Eddie Martinez <br />Construction Experience: 34 Years <br /> <br />EDUCATION <br />BS Civil Engineering, University of Havana, Cuba <br /> <br />CERTIFICA TIONS <br />Current USACE Construction Quality Management <br />(CQM) for contractors Certificate <br />CTQP Asphalt Paving Technician Level 1 & 2 <br />CTQP Earthwork Construction Inspector Level 1 & 2 <br />CTQP QC Manager <br />Nuclear Gauge Safety Certification <br />OSHA 30 <br /> <br />STATEMENT OF QUALIFICATIONS <br />RESUMES <br /> <br /> <br />RESPONSIBILITIES <br />Carlos is responsible for monitoring the various components of ITS Operations Facility, Ft. Lauderdale, FL - The project is <br />construction so that a continuing system of quality assurance divided into four phases (1) partial demolition of the existing <br />prevails. He also maintains the Quality Control program occupied building, (2) construction of a new 2-story 42,400 <br />so that construction is in accordance with the contractual SF building, (3) complete demolition of the existing building, <br />requirements, plans, specifications, applicable codes, and (4) sitework. <br />accepted industry standards, and within a predetermined <br />cost and time framework. <br /> <br />EXPERIENCE <br />Mr. Hernandez has worked for MCM for over 8 years as our <br />Quality Control Representative, he brings a wealth of Civil <br />and Commercial experience to this project. Carlos's relevant <br />project experience includes the following: <br /> <br />Miami International Airport 756AD - This $125 Million <br />projects consists of General construction of renovations in <br />the existing terminal building located in terminal areas A <br />through D on levels 1, 2 and 3. <br /> <br />MDX SR 836 Extension & Toll Plaza, Miami, FL - Widening <br />and Reconstruction of the SR 836 Expressway approximately <br />1.1 miles in length, from 1900 feet east of NW 107th Ave <br />to 2500 west of 87th Ave. The project also includes the <br />construction of new eastbound and westbound mainline toll <br />plazas. <br /> <br />Hialeah Expressway, Miami, Florida - Widening and <br />Reconstruction of SR 934 consisting of the following: Addition <br />of 1 lane each way, widening the road from four to six lanes. <br />Widening of bridges over the FEC Railroad at NW 69th Ave <br />and W. 5th Way. Upgrade of drainage, lighting and signals. <br />Building noise walls near residential areas. <br /> <br />GTI Central Collection Plaza, Miami, Florida - The GTI <br />Central Collections Plaza consists of a new centralized <br />parking collections plaza for MIA, and administration building <br />totaling approximately 17,000 sf. <br /> <br />EMPLOYMENT <br />1998 to Present MCM Corp, QAlQC Manager <br /> <br />1995 to 1998 Envirotech Contractors, Inc. <br />Superintendent <br /> <br />1990 to 1995 Cuba Construction Ministry <br />Principal Engineer <br /> <br />1987 to 1990 Jose Marti Iron & Steel Plan <br />Consultant Engineer <br /> <br />'" <br />en <br />'" <br />C <br />'" <br />~ <br />~ <br />"- <br />~ <br />c <br />'" <br />-"< <br />~ <br />'" <br />en <br />c <br />'" <br />::t: <br />'" <br />~ <br />'" <br />'" <br />.5 <br />'" <br />c <br />'" <br />ti <br />~ <br />.3 <br /> <br />] <br /> <br />d: <br /> <br />::; <br />~ <br /><=> <br />ci <br />:z: <br />~ <br /><>< <br /> <br />. <br />