Laserfiche WebLink
<br /> <br />Building Information Modeling (BIM): produce 3D project drawings for coordination, layout & <br />constructability reviews, which reduces lost time, RFI's and change orders. <br /> <br />Weitz and their major subs can model key building components using Constructor and Navisworks <br />software to facilitate the shop drawing coordination and clash detection process. The most significant <br />benefit realized by using BIM through both the design and construction process is the reduction of RFI's <br />generated during construction, resulting in a reduction of both lost time and change orders. <br /> <br />Subcontractor Prequalification: The Weitz Company prequalifies all of our subcontractors for safety <br />procedures, level of performance, quality of performance, and bonding capacity. <br /> <br />Safe work to eliminate the disruption of lost time: The Weitz Company's safety record exceeds <br />our competition-our Experience Modification Ratio is a best in class at 0.51. In fact, The Weitz Company <br />has not had a lost-time incident since 2004. We also want you to know that we have put in over 1.9 million <br />man-hours during this ongoing record. <br /> <br />The Weitz Company will utilize innovative techniques to complete your project faster: By <br />utilizing proven scheduling methods in conjunction with constructability modeling, we will complete your <br />project faster. The two projects charted below <br />enjoyed substantial schedule reductions as a <br />direct result of Lean scheduling. For example, <br />the Hy-Vee store had been built more than <br />20 times previously. By using Lean, we cut <br />an additional three weeks (or 10%) from a <br />schedule that the Client believed had been <br />optimized, resulting in over $300k in savings <br />for the Client. <br /> <br />Weitz use of LEAN In ovation Saves Time and <br />Money <br /> <br />In <br />; <br />c: <br />o <br />== <br /> <br /> <br />.Acheived Schedule <br />w/LEAN <br /> <br />o Baseline Schedule <br /> <br />Hy-Vee Store <br /> <br />Other Services-Building with Long- <br />Term Efficiency for the Greatest Value <br />In support of your goal to incorporate <br />"green" elements into the Heritage Park <br />and Parking Garage, we have assigned a "Green Champion" to present the life-cycle cost analysis for <br />your project, as well as providing guidance and reporting for the Leadership in Energy and Environmental <br />Design (LEED) Certification level for your project. The LEED AP that we <br />provide to you is fluent in the requirements of obtaining LEED certification, <br />including point submittals, and will ensure the City of Sunny Isles Beach that <br />a cost-efficient design, with input from Subcontractors on the latest LEED- <br />compliant materials, life-cycle costs, and energy efficiency are an integral part <br />of the design and construction that will lead to positive long term savings. <br /> <br />Iowa Health <br />Systems <br /> <br />TWe LEAN Successes <br /> <br /> <br />CITY OF SUNNY ISLES BEACH RFO FOR CONSTRUCTION SERVICES FORTHE HERITAGE PARK AND PARKING GARAGE <br />