My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moriarty
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Moriarty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 4:24:52 PM
Creation date
4/25/2011 4:24:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-.MORIARTY <br /> <br />Logistics and Site Staging <br />We will prepare a logistics plan for this project that will be reviewed with the project team. <br />Logistical challenges to the project will be to coordinate site work activities with the garage <br />activities. Generation of noise, dust and traffic from construction will have to be mitigated to <br />satisfy local requirements. Subcontractor parking areas and truck delivery routes will be <br />coordinated to meet the staging requirements to ensure that the existing bus stop and Hotel <br />operations are maintained. <br /> <br />Constructability and Coordination <br />Expediting the timetable for the garage structure will be a key element to the success of this <br />project. The NOA's required for the decorative skin will need to be a priority to ensure the fast <br />pace of the schedule is kept. Coordination of plumbing, mechanical and sprinkler work will be <br />performed well ahead of the work in the field to prevent field coordination problems, <br />maintenance access issues, and to ensure scheduling is met. <br /> <br />Aside from JMA's more than 14 years of presence in the City of Sunny Isles Beach, we have had <br />experience working with; KACO, the geotechnical engineer on numerous projects; with EDAW, <br />the Landscape Architect and would work closely with the City to continue our collaborative team <br />approach that has proven to be our formula for success. <br /> <br />Quality Assurance <br /> <br />Quality compliance will be monitored on the jobsite at all times. JMA also joins in a collaborative <br />effort with threshold inspectors, specialty inspectors, the design team and the Owner to ensure <br />that details and quality inspections are maintained from the first submission of shop drawings <br />all the way thru to project turnover and completion. JMA has developed quality inspection <br />sheets for the various stages of the project that are maintained by the project Superintendent <br />during the course of construction to ensure that work is in compliance with project <br />specifications and manufacturer's requirements. <br /> <br />Schedule and Execution of the Work <br />High productivity is best achieved by clearly establishing schedule and sequencing, and by <br />running a safe and clean job. We have attached a preliminary schedule based on the present <br />design and will evaluate pre-cast options for both the garage structure and the external V <br />stucco system. If we are selected for the next phase of evaluation, JMA will offer our expertise <br />across all disciplines and present the Owner with aggressive, but realistic attainable schedules <br />for options that should be explored. <br /> <br />Our preliminary schedule has the Phase I Garage being ready for beneficial use within 6-7 <br />months and the park being completed approximately 4 months after. <br />