<br /> <br />ection 4: Response to RFQ Section # 1.5 questions 8 and 9 cont'd <br /> <br />KM/Plaza uses a quantitative method of estimating and budgeting, mixed with some of the latest tech- <br />nology to help expedite and streamline the budgeting process and the updating of each progress budget. <br />Our entire estimating department uses digitizer software for take-offs which can be imported into our <br />Excel format for estimating. Our formats are completely standardized, once again keeping the process <br />familiar and easy to update at each budget revision, Typically a budget is updated with the issuance of <br />a revised set of documents or with the acceptance of Value Engineering options. Our budgets have always <br />been within 5% of the final GMP value. Our GMP's have historically been less than the budgets for each <br />project, This accuracy has therefore never put our clients in a situation of being surprised by the final <br />price. The estimates are always done independently of subcontractor bids, but then supported by the <br />market place once the estimate is completed. The final budget estimate becomes a joint effort between <br />estimating using historical data and actual bids from the local market place, <br /> <br />Our staff, including our President, Brad Meltzer (Master of Architecture), is stocked with trained profes- <br />sionals that are able to provide not only strong Value Engineering possibilities, but also with a potential- <br />ly more important component; the Constructability Review. This review is performed on all of our proj- <br />ects and is done at each stage that budgets are updated. This allows us to explore the project, the thor- <br />oughness of the documents, and the way in which the project will be built, before the Construction <br />Documents are issued for bid. An example of this effort can be seen on The Marquis. Prior to issuing the <br />drawings to the subcontractor market for the bid of this 67 story tower, KM/Plaza completed a <br />Constructability Review that included over 1400 issues that required resolution. These items were all <br />answered and responded to by the design team and included in the bid documents, This prevented approx- <br />imately 1400 items from becoming RFI's, change orders, delays, etc. At each stage of Design Development <br />(25%, 50%, 75% and 100%) the entire list was updated, added to and confirmed, thereby confirming all <br />open and closed issues at the time of final documents. With our firm's history as an Owner/Builder, <br />KM/Plaza takes expenditure of the client's funds as our most critical mission, With this in mind, we have <br />established a program that has proven to save our client's significant dollars through Value Engineering. <br /> <br />An example of Value Engineering that realized significant savings was the garage surround on the Carillon <br />II project, By simply changing the "wavy wall" element that surround the parking structure from poured <br />in place concrete to precast, we were able to reduce the GMP by $400,000.Not only did this save a great <br />deal of money, but it actually increased the quality and aesthetic that the Owner and Architect were look- <br />ing for. Another Value Engineering achievement occurred on the Marquis. This project stands 67 stories <br />tall. The value of the eventual glazing contract was in excess of $10 million. One suggestion we made <br />was modifying the color of glass specified. This change proved to yield a cost savings of over $ 1 million <br />and is almost unnoticeable to the naked eye. <br />