My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KM Plaza
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
KM Plaza
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2011 4:28:30 PM
Creation date
4/25/2011 4:28:23 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ection 2: Response to RFQ Section # 1.5 questions 5 thru 6 <br /> <br />5. KM/Plaza Personnel: <br /> <br />eM Key Personnel pro- <br />posed for this <br />project <br /> <br />Brad Meltzer, Principal <br /> <br />David Bagnall, Corporate General <br />Superintendent <br /> <br />Joe Rodriguez, Project <br />Superintendent <br /> <br />Marcel Fernandez, Sr. Project <br />Manager <br /> <br />Rich Ruiz, Chief Estimator <br /> <br />Responsibilities <br /> <br />Over 20 year of professional construction experience, both new and mod- <br />ernized facilities, architectural schooling paired with his vast construction <br />backgound gives him a unique perspective when crafting projects requiring <br />critical advanced planning, difficut staging and logistics, fast track schedul- <br />ing, and maintenance of on-going operations. Leads both the preconstruc- <br /> <br />tion and construction teams for the project maintaining direct ownership <br />involvement for the entirety of the project. Has experience working with all <br />team members on previous projects. Please see resume attached <br /> <br />Has over 30 years of construction experience. Involved from the start dur- <br />ing the preconstruction phase thru construction completion. Also, responsi- <br />ble for planning and overall quality control for KM/Plaza work. Daily visits <br />to jobsite to ensure quality, progress, scheduling. Meets with each super, <br />attends weekly subcontractor and OAC meetings, reviews safety issues <br />and resolves conflicts. OSHA approved safety director. Reputation among <br />his peers, clients and design professionals as a true leader,driving projects <br />to completion and to the highest standards. Has experience working with <br />all team members on previous projects .Please see resume attached. <br /> <br />Superintendent for over 18 yrs. Supervises the quality and efficiency of the <br />shell envelope of the building including masonry, windows, stucco, roofing, <br />waterproofing, as well as site work and through building completion. On a <br />daily basis works with project manager and general superintendent and esti- <br />mators to fully understand scope. Tracking and expediting of long lead items. <br />monitors shop drawings, and prepares daily activity reports. Some project <br />experience includes the Carillon II (part of the Canyon Ranch Project), The <br />W Resort & Residence. <br /> <br />Involved from the start in preconstruction and is responsible for overseeing <br />the construction operations, contract administration and construction docu- <br />mentation for the entire project. Has experience working with the following <br />team members: Brad Meltzer, Dave Bagnall,Rich Ruiz. Please see resume <br />attached <br /> <br />Responsible for estimating from the earliest drawings through construction <br />documents, to developing a GMP estimate with specifications and qualifica- <br />tions, continues thru purchasing phase of project. Has experience working <br />with the following team members: Brad Meltzer, Dave Bagnall,Marcel <br />Fernandez. Please see resume attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.