<br />and Pavarini would have faced schedule delays. However, rather than waiting for the rain to stop, Pavarini
<br />implemented the following adjustments: a) the sequence of the work was changed, so that construction process would
<br />.
<br />continue and b) instead of releasing the stucco crew due to the rain, the crew was placed on the stand-by mode. Not
<br />only these adjustments allowed Pavarini to continue with the work and meet Owner's needs, but we also managed to
<br />complete the project one month ahead of schedule! '
<br />
<br />.
<br />2. At the time when Pavarini was pouring the 5th floor, the Owner added an extension to the 4th floor. To be able to
<br />expedite with this Owner's decision, Pavarini added special shoring to support the 5th floor and then m~Jnaged to pour
<br />the requested extension to the 4th floor. '
<br />.
<br />3. Pavarini was pouring the 15th floor of the Courts, 'when the Owner decided to open a Sales Center on the" 4th
<br />floor. In order to make it possible, Pavarini had built a tunnel that connected the top floor of the adjacent 4-story
<br />building with the Courts' 4th floor for access to the new Sales Center, provided all necessary safety requirements, and
<br />worked along with the City and Fire Department in order for this extraordinary plan to work.
<br />
<br />CONFLICT RESOLUTION EFFORTS
<br />, PROJECT: South Dade Sr. High - State School CCC1, Homestead, Florida
<br />State School CCC-1 required the building of a new school and the demolition of the old facility. The school had an
<br />agricultural field upon which the students grew crops. It was necessary to develop.a new agricultural field following the
<br />demolition of the old school. In order to meet the Owner's needs, relative to the replacement of the field, Pavarini met
<br />with the "Agricultural Advisory Committee" that was set up to plan this agricultural field relocation, The committee was
<br />very involved with the future planning of the school's agricultural program and the design of the future grove area. The
<br />advisory committee consisted of local farmers, past alumni and members of the School Board that looked for a positive
<br />outreach with the school. As an accomrl)~dation to the committee, Pavarini and the Design Criteria Professional (TAP)
<br />had to present several options and estimates before a final plan was voted qn and approved.
<br />
<br />PROJECT: Orange'Brook Elementary School Phased Replacement, Hollywood, Florida
<br />Because the site was tight it was necessary for us to meet with, the City of Hollywood to coordinate offsite parking
<br />issues. By partnering with the City we were able to have them relax their offsite parking criteria., Early identification of
<br />these issues and excellent communication with the key parties resulted in an effective solution to two major problems.
<br />We partnered "';ith the City of Hollywood Inspection Department to relax the off-site parking for constructio~ workers,
<br />
<br />SCHEDULING EFFORTS
<br />PROJECT: FlU Parking Garages #3 & #4, Miami, Florida
<br />One of the greatest challenges of this project was doing two buildings at the same time, 'and trying to keep both ~n
<br />schedule. The structure of the parking decks was extremely difficult due to the continuous slopping planes of the deck, .
<br />and the separation of parts of the structure due to load efficiency and' expansion. We overcome this by setting up a
<br />quality control plan and double-checking the layout, Also, scheduling updates were done weekly using subcontractors
<br />input to work out conflicts.
<br />
<br />VALUE ENGINEERING EFFORTS
<br />PROJECT: Mandarin Oriental Hotel, Brickell Key, Miami, Florida
<br />..
<br />,The Mandarin Oriental Hotel, one of Pavarini's projects constructed on Brickell Key, is a fan.shaped building
<br />presented certain structural challenges. Pavarini's suggestion of using smaller pre-cast segmented sections, than those
<br />specified, increased the number of manufacturers from which to choose and provided increased savings in the size of
<br />structural members. This greater <;ompetition and reduction in size of structural components saved significant cost'
<br />without sacrificing architectural quality. We also shared our knowledge of roofing systems, and pleased both Owner
<br />and Architect with a suggestion of a type of system that was less expensive to install and provides the Mandarin
<br />Oriental with a better warranty,
<br />
<br />
<br />QUALITY CONTROL EFFORTS
<br />PROJECT: South Dade Sr. High - State School CCC1, Homestead, Florida
<br />1. During final cleaning, extra care was taken to prevent damage to the finished; polished floors throughout the
<br />campus. Once the floors were polished within a building, all workers were required to wear protective covers -
<br />urgical booties - over their, boots to eliminate the possibility of scratches, marks or dirt. Protection of the finished
<br />
<br />5TATEMENT OF QUALIFICATIONS TO PROVIDE PROFESSIONAL CONSTRUCTION SERVICES ,FOR
<br />THE HERITAGE PARK AND PARKING GARAGE I CITY OF SUNNY ISLES BEACH. FL I RFQ 09-03-01
<br />
<br />~
<br />~
<br />
<br />12
<br />
|