<br />. <br /> <br />,.~~ PAVARINI <br /> <br />~ CONSTRUCTION COMPANY <br /> <br />and Pavarini would have faced schedule delays. However, rather than waiting for the rain to stop, Pavarini <br />implemented the following adjustments: a) the sequence of the work was changed, so that construction process would <br />. <br />continue and b) instead of releasing the stucco crew due to the rain, the crew was placed on the stand-by mode. Not <br />only these adjustments allowed Pavarini to continue with the work and meet Owner's needs, but we also managed to <br />complete the project one month ahead of schedule! ' <br /> <br />. <br />2. At the time when Pavarini was pouring the 5th floor, the Owner added an extension to the 4th floor. To be able to <br />expedite with this Owner's decision, Pavarini added special shoring to support the 5th floor and then m~Jnaged to pour <br />the requested extension to the 4th floor. ' <br />. <br />3. Pavarini was pouring the 15th floor of the Courts, 'when the Owner decided to open a Sales Center on the" 4th <br />floor. In order to make it possible, Pavarini had built a tunnel that connected the top floor of the adjacent 4-story <br />building with the Courts' 4th floor for access to the new Sales Center, provided all necessary safety requirements, and <br />worked along with the City and Fire Department in order for this extraordinary plan to work. <br /> <br />CONFLICT RESOLUTION EFFORTS <br />, PROJECT: South Dade Sr. High - State School CCC1, Homestead, Florida <br />State School CCC-1 required the building of a new school and the demolition of the old facility. The school had an <br />agricultural field upon which the students grew crops. It was necessary to develop.a new agricultural field following the <br />demolition of the old school. In order to meet the Owner's needs, relative to the replacement of the field, Pavarini met <br />with the "Agricultural Advisory Committee" that was set up to plan this agricultural field relocation, The committee was <br />very involved with the future planning of the school's agricultural program and the design of the future grove area. The <br />advisory committee consisted of local farmers, past alumni and members of the School Board that looked for a positive <br />outreach with the school. As an accomrl)~dation to the committee, Pavarini and the Design Criteria Professional (TAP) <br />had to present several options and estimates before a final plan was voted qn and approved. <br /> <br />PROJECT: Orange'Brook Elementary School Phased Replacement, Hollywood, Florida <br />Because the site was tight it was necessary for us to meet with, the City of Hollywood to coordinate offsite parking <br />issues. By partnering with the City we were able to have them relax their offsite parking criteria., Early identification of <br />these issues and excellent communication with the key parties resulted in an effective solution to two major problems. <br />We partnered "';ith the City of Hollywood Inspection Department to relax the off-site parking for constructio~ workers, <br /> <br />SCHEDULING EFFORTS <br />PROJECT: FlU Parking Garages #3 & #4, Miami, Florida <br />One of the greatest challenges of this project was doing two buildings at the same time, 'and trying to keep both ~n <br />schedule. The structure of the parking decks was extremely difficult due to the continuous slopping planes of the deck, . <br />and the separation of parts of the structure due to load efficiency and' expansion. We overcome this by setting up a <br />quality control plan and double-checking the layout, Also, scheduling updates were done weekly using subcontractors <br />input to work out conflicts. <br /> <br />VALUE ENGINEERING EFFORTS <br />PROJECT: Mandarin Oriental Hotel, Brickell Key, Miami, Florida <br />.. <br />,The Mandarin Oriental Hotel, one of Pavarini's projects constructed on Brickell Key, is a fan.shaped building <br />presented certain structural challenges. Pavarini's suggestion of using smaller pre-cast segmented sections, than those <br />specified, increased the number of manufacturers from which to choose and provided increased savings in the size of <br />structural members. This greater <;ompetition and reduction in size of structural components saved significant cost' <br />without sacrificing architectural quality. We also shared our knowledge of roofing systems, and pleased both Owner <br />and Architect with a suggestion of a type of system that was less expensive to install and provides the Mandarin <br />Oriental with a better warranty, <br /> <br /> <br />QUALITY CONTROL EFFORTS <br />PROJECT: South Dade Sr. High - State School CCC1, Homestead, Florida <br />1. During final cleaning, extra care was taken to prevent damage to the finished; polished floors throughout the <br />campus. Once the floors were polished within a building, all workers were required to wear protective covers - <br />urgical booties - over their, boots to eliminate the possibility of scratches, marks or dirt. Protection of the finished <br /> <br />5TATEMENT OF QUALIFICATIONS TO PROVIDE PROFESSIONAL CONSTRUCTION SERVICES ,FOR <br />THE HERITAGE PARK AND PARKING GARAGE I CITY OF SUNNY ISLES BEACH. FL I RFQ 09-03-01 <br /> <br />~ <br />~ <br /> <br />12 <br />