Laserfiche WebLink
<br />~ <br /> <br />Project Team <br /> <br /> <br />~ <br />Hovis <br />Lend Lease <br /> <br />5. Description of contractor's project team to include the name, responsibilities, and resumes of key <br />personnel that will be assigned to this Project. <br /> <br />Peter McCann Principal In Charge-Vice President / Project Executive <br /> <br /> <br />. , <br /> <br />Years of Industry <br />Experience <br />18 <br /> <br />Education <br />Georgia Institute of <br />Technology <br />B.S., Mechanical Engi- <br />neering . <br /> <br />Professional <br />Affiliations <br />Registered Professional <br />Engineer, Mechanical <br /> <br />Role for this Project <br />As Project Executive, Peter will work closely with both the preconstruction and <br />construction teams from estimating to project closeout. He will perform on-site <br />inspections of the work, review risk control systems and provide advice, council and <br />direction. He will run monthly owner/architecUconstruction manager meetings. <br />Peter will have overall project responsibility including but not limited to quality, cost, <br />schedule and safety. <br /> <br />Relevant Project Experience <br /> <br />. Four Seasons Hotel & Tower <br />Miami, Florida <br />A 64-story, 1,880,801 sf, mixed-use high-rise which includes a 221-room, Five- <br />Star Four Seasons Hotel, 185 luxury condominiums, eight penthouses, an 84- <br />room extended stay hotel, 264,619 sf of office space, a 40,000 sf sports club & <br />spa, 64,543 sf recreation deck, 12,125 sf of retail space, 9,095 sf of restau- <br />rants, an 80 ft waterfall and an 892-space, seven-story parking garage. Con- <br />struction value: $265 million. <br /> <br />. Overtown Transit Village and Parking Phase II <br />Miami, Florida <br />A 469,000 sf project that will be a 22 story building consisting of 6 floors of <br />parking with 335 parking spaces and 16 floors of office space. The structure <br />will be cast-in-place concrete with post tension slabs, interior shear walls and <br />perimeter columns. The exterior walls will be CMU with a painted stucco finish, <br />punched windows and some slab-to-slab window wall. The interior will include <br />finished elevator lobbies and restrooms with furred out and painted perimeter <br />walls for an open office area with carpeted floors, 9 ft finished acoustical ceil- <br />ing, electrical, lighting, and air conditioning distribution. Cost: $57.5 Million <br /> <br />. Overtown Transit Village and Parking Phase I <br />Miami, Florida <br />This 554,141 sf project, the latest of several tied to Metroraillines, houses a 17 <br />-story administrative building, ground floor retail, the transit office's credit union, <br />plus a nine-story parking garage with a 596-car parking capacity. There are <br />also seven passenger elevators and one service elevator. Cost: $43.8 Million <br /> <br />. Ocean Marine Yacht Club <br />Hallandale Beach, Florida <br />A 704,000 sf new condominium high-rise including a 27 -story tunnel form con- <br />dominium tower; a 4-story tunnel form low-rise condominium building; a <br />188,892 sf, 4-story precast parking garage with a 551 parking space capability; <br />a 2-story tunnel form cabana building; and five passenger elevators with one <br />service elevator. There are a total of 267 condominium units in the tower and <br />16 units in the low-ri.se building. <br /> <br /> <br />Request for Qualifications No. 09-03-01 <br />Professional Construction Services for the fleritage Park and <br />Parking Garage <br /> <br />[!] <br />