<br />~
<br />
<br />Project Team
<br />
<br />
<br />~
<br />Hovis
<br />Lend Lease
<br />
<br />Michael McMillon Senior Superintendent
<br />
<br />
<br />. ,
<br />
<br />Years of Industry
<br />Experience
<br />30
<br />
<br />Education
<br />Gainesville Junior
<br />College Degree in
<br />Business Administration
<br />and Personnel
<br />Management
<br />
<br />Licenses
<br />Florida General
<br />Contractor
<br />
<br />Role for this Project
<br />As Superintendent, Michael will supervise and coordinate all field level con-
<br />struction activities of the numerous trades on the project to achieve project
<br />milestones and the overall construction schedule, as well as maintaining con-
<br />struction quality control and a safe working environment.
<br />
<br />Relevant Project Experience
<br />
<br />. Four Seasons Hotel & Tower
<br />Miami, Florida
<br />A 64-story, 1,880,801 sf, mixed-use high-rise which includes a 221-room, Five-
<br />Star Four Seasons Hotel, 185 luxury condominiums, eight penthouses, an 84-
<br />room extended stay hotel, 264,619 sf of office space, a 40,000 sf sports club &
<br />spa, 64,543 sf recreation deck, 12,125 sf of retail space, 9,095 sf of restau-
<br />rants, an 80 ft waterfall and an 892-space, seven-story parking garage. Con-
<br />struction value: $265 million.
<br />
<br />. Overtown Transit Village and Parking Phase II
<br />Miami, Florida
<br />A 469,000 sf project that will be a 22 story building consisting of 6 floors of
<br />parking with 335 parking spaces and 16 floors of office space. The structure
<br />will be cast-in-place concrete with post tension slabs, interior shear walls and
<br />perimeter columns. The exterior walls will be CMU with a painted stucco finish,
<br />punched windows and some slab-to-slab window wall. The interior will include
<br />finished elevator lobbies and restrooms with furred out and painted perimeter
<br />walls for an open office area with carpeted floors, 9 ft finished acoustical ceil-
<br />ing, electrical, lighting, and air conditioning distribution. Cost: $57.5 Million
<br />
<br />. Richland Memorial North Parking Structure & Campus Roads
<br />Columbia, South Carolina
<br />A 261,600 sf, 658 parking space, 5 story caisson supported post-tensioned
<br />concrete structure with architectural precast concrete exterior and two traction
<br />elevators. Cost: $4 Million
<br />
<br />. Met 1 - Miami
<br />Miami, Florida
<br />A 1,000,000 sf, 447-unit, luxury condominium that includes 90 double story
<br />lofts, 336 single story units, 21 penthouses, and a 195,000 sf, 631-space park-
<br />ing garage, with a total site area of 1.16 acres. Cost is confidential.
<br />
<br />. Cipriani Ocean Resort and Residences
<br />Miami Beach, Florida
<br />A mixed use project consisting of the rehabilitation and renovation of the old
<br />Saxony hotel into a state of the art hotel and a 19-story condominium complete
<br />with underground parking facilities. Cost: $200 Million.
<br />
<br />
<br />Request for Qualifications No. 09.03.07
<br />ProfeSSional Construction Services for the Heritage Park and
<br />Parking Garage
<br />
<br />m
<br />
|