<br />~
<br />
<br />
<br />Project Team
<br />
<br />~
<br />Hovis
<br />Lend Lease
<br />
<br />Christopher Murray Project Manager
<br />
<br />
<br />.. , .- ..
<br />
<br />Lend Lease for Jour u{J..coming pJo)ect. "
<br />
<br />
<br />-
<br />-
<br />--
<br />~~~-
<br />-.
<br />
<br />Years of Industry
<br />Experience
<br />10
<br />
<br />Education
<br />Clemson University
<br />BS, Civil Engineering
<br />
<br />Licenses
<br />LEED Accredited
<br />Professional
<br />
<br />Role for this Project
<br />Christopher is responsible for the daily management, supervision, coordination, and
<br />successful completion of the project, to meet time and cost objectives with respect
<br />to budgeting, contracting, scheduling, estimating, bidding, and contract administra-
<br />tion functions.
<br />
<br />Relevant Project Experience
<br />
<br />. Four Seasons Hotel & Tower
<br />Miami, Florida
<br />A 64-story, 1,880,801 sf, mixed-use high-rise which includes a 221-room, Five-
<br />Star Four Seasons Hotel, 185 luxury condominiums, eight penthouses, an 84-
<br />room extended stay hotel, 264,619 sf of office space, a 40,000 sf sports club &
<br />spa, 64,543 sf recreation deck, 12,125 sf of retail space, 9,095 sf of restau-
<br />rants, an 80 ft waterfall and an 892-space, seven-story parking garage. Con-
<br />struction value: $265 million.
<br />
<br />. Overtown Transit Village and Parking Phase II
<br />Miami, Florida
<br />A 469,000 sf project that will be a 22 story building consisting of 6 floors of
<br />parking with 335 parking spaces and 16 floors of office space. The structure
<br />will be cast-in-place concrete with post tension slabs, interior shear walls and
<br />perimeter columns. The exterior walls will be CMU with a painted stucco finish,
<br />punched windows and some slab-to-slab window wall. The interior will include
<br />finished elevator lobbies and restrooms with furred out and painted perimeter
<br />walls for an open office area with carpeted floors, 9 ft finished acoustical ceil-
<br />ing, electrical, lighting, and air conditioning distribution. Cost: $57.5 Million
<br />
<br />. Overtown Transit Village and Parking Phase I
<br />Miami, Florida .
<br />This 554,141 sf project, the latest of several tied to Metroraillines, houses a 17
<br />-story administrative building, ground floor retail, the transit office's credit union,
<br />plus a nine-story parking garage with a 596-car parking capacity. There are
<br />also seven passenger elevators and one service elevator. Cost: $43.8 Million
<br />
<br />. Pentagon Row
<br />Arlington, Virginia
<br />A 1.5 million SF, mixed-use project, consisting of 504 apartments, including 70
<br />high-end luxury units complete with marble finishes and hard wood floors,
<br />~50,000 SF of retail shops, and two levels of below grade parking to accommo-
<br />date up to 1,700 cars. Cost: $111 Million
<br />
<br />. Portofino Bay Resort Hotel
<br />Orlando, Florida .
<br />A 5-story, 831,000 SF, 750-unit luxury hotel at Universal Studios with a 3-
<br />story, 279,000 SF parking facility. Cost: $130 Million
<br />
<br />
<br />Request for Qualifications No. 09-03-07
<br />Professional Construction Services for the Heritage Park and
<br />Parking Garage
<br />
<br />I[J
<br />
|