Laserfiche WebLink
<br />I() <br />I <br />CI <br />. <br />. <br />. <br />. <br />~ <br />. <br />.. <br />. <br />. <br />~ <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />lJ <br />() <br />. <br />. <br />.(1 <br />~. <br />. <br />. <br /> <br />,: <br />I. <br />. <br />. <br />. <br />() <br />It <br />. <br />. <br />() <br />() <br />~l <br />I. <br />. <br />. <br />. <br /> <br />PARKING PROJECTS <br /> <br />Southern Pan Services and its Hybrid Concrete Structures division <br />have been involved in hundreds of parking projects as either a form- <br />work contractor, concrete frame contractor or design-build contrac- <br />tor. Our team of professionals is dedicated to offering the most prac- . <br />tical and economical solution for each project and works closely with <br />Owners, Design Professionals, Consultants and Contractors from <br />concept through completion. <br /> <br /> <br />Our,experience consists of parking projects for health care, hospital- <br />ity, college/university, aviation, governmental and commercial parking facilities. <br /> <br />We offer a full range of services including: <br /> <br /> <br />Preconstruction Services <br />Structural Frame Construction <br />Design-Build <br />Formwork Rental <br />Formwork Subcontractor <br /> <br /> <br />~ <br /> <br />Through the SPS subsidiary, Hybrid Concrete Structures, we are also able to offer <br />Owners a hybrid post-tensioned structural system with the quality of cast-in-place/post- <br />tensioned deck construction along with the speed and economy of precast construc- <br />tion. <br /> <br /> <br />Georgia State University <br />Atlanta. GA <br /> <br />Total Project: 1.2 Million SF <br />Total Parking: 400.000 SF <br /> <br />1-IC'5 <br />~~S <br /> <br />SpS <br />..".............-........"'<;"...... <br />_._....n-........_..._.......... <br /> <br />