My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hybrid Concrete Structures
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(09-03-01) Prof. Construction Svcs. for Heritage Park & Pkg. Garage
>
Responses
>
Hybrid Concrete Structures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 4:10:35 PM
Creation date
4/26/2011 4:10:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Construction Svcs. for Heritage Park & Pkg. Garage
Bid No. (xx-xx-xx)
09-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />I. <br /> <br />, <br /> <br />I. <br />I. <br />:.. <br />. <br />. <br />. <br />. <br />I. <br />I. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br />. <br />. <br />a <br />. <br />1. <br />. <br />. <br />. <br />" <br />. <br />. <br />() <br />. <br />\) <br />. <br />. <br /> <br />COMPANY PRO:FILE <br /> <br />I <br /> <br />Hybrid Concrete Struct!lres is a wholly owned sub- <br />sidiary of Southern Pan Services and was established <br />by SPS to focus solely on the design-build parking <br />market. While the Owners of SPS had continuously <br />been in the business of form rental, formwork erection <br />and total concrete frame construction since 1980, it <br />was determined that the market would be better <br />served by a company specialized in the design and <br />construction of post-tensioned parking garages. HCS <br />offers Owners a post-tensioned structural solution for <br />parking garages which is often the best value when <br />corflpared to other competing structural systems. <br /> <br /> <br />.~. <br /> <br />~~~ <br />.....-.......- <br /> <br />During the last five years, The SPS group of companies <br />has formed and/or erected over twenty million square feet <br />of concrete structures and provides Class A-8 surety <br />bonds as may be required. <br /> <br /> <br />It: <br />-'I <br /> <br />We have been consistently successful because we believe <br />that our main product is customer service and we strive to <br />give our customers quality work, on time, with value <br />added. <br /> <br />We have developed a loyal customer base in our strate- <br />... <br />gic market areas in the Southeastern United States ena- <br />bling us to achieve a 90 % repeat business. This unique <br />position has been achieved because we know our cus- <br />tomers abilities and needs on all levels. These factors <br />enable us to choose the right projects. The companies <br />operate from offipes in Atlanta, Fort Lauderdale and <br />Charlotte to serve its clients throughout the Southeast. <br /> <br />I <br />Over the last several years we have formed an un- <br />matched synerg~ with our Design-Build Parking Garage <br />professional partners and together have developed into <br />a proven Team. I <br />I <br /> <br /> <br />1-IC5' <br /> <br />'~STRII:Tl.IlESI <br /> <br /> <br />SpS <br /> <br />...=-....:::-.:.=..~~~~ I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.