Laserfiche WebLink
<br />August 19, 2010 <br />Rick Conner <br />City of Sunny Isles Beach - Bella Vista <br />Page 3 of3 <br /> <br />· Concrete canoe ramp and water access steps <br />· Miscellaneous walls and structures <br /> <br />Landscape Architecture <br /> <br />· Provide Landscape planting plans with details and specifications. <br />· Hardscape layout plans showing new paver walkways. <br />. Landscape lighting plans <br />. Irrigation plans with details and specifications <br /> <br />Electrical <br /> <br />· Electrical design for general lighting as well as service for prefab-structure <br /> <br />II. BASIC SERVICES <br /> <br />A. CONSTRUCTION DOCUMENTS PHASE <br />Based on the previously approved design scheme, construction documents will be prepared <br />which define the materials, and components for the project. The completed construction <br />documents shall include civil, structural, landscaping, architectural, and electrical drawings <br />as required to obtain a building pemrit, as well as bids from qualified contractors. No <br />technical specification book will be provided. Project specification will be provided by <br />way of notes of the drawings. <br /> <br />B. CONSTRUCTION ADMINISTRATION PHASE <br /> <br />LIVS Associates will provide services during construction to include: review of contract <br />submittals; responses to questions (RFl's), and issuance of clarifications related to our <br />documents. Two monthly visits will be pelformed for observation of the work to assist the <br />client in monitoring the progress of the work and compliance with the requirements of the <br />contract documents. This phase will be billed on an hourly basis as requested by the City <br />of Sunny Isles Beach per our agreement. <br /> <br />III. FEE SCHEDULE AND PAYMENT <br /> <br />A. BASIC SERVICES <br /> <br />LIVS will provide professional services for the above referenced project, consisting of the <br />scope and basic services previously outlined for the fee 0[$34,771 (Thirty four thousand <br />seven hundred and seventy on~). This fee will be divided ac; follows: <br /> <br />Basic Services <br />. A. Construction Document Phase <br />TOTAL <br /> <br />Percentage of Fee* <br />100% <br />100% <br /> <br />Amount <br />$ 34,771.00 <br />$ 34,771.00 <br /> <br />SIB <br />