My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Addendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 10:02:18 AM
Creation date
5/12/2011 10:02:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isles Utility & Roadway Improv.
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SECTION 00900 <br /> <br />Addendum No.3 <br />to <br />Contract documents <br /> <br />CITY OF SUNNY ISLES BEACH <br />Atlantic Isles Roadway and Utility Improvements <br />CGA PROJECT NO. 05-4893 <br />CITY BID NO. 08-06-01 <br /> <br />To All Bidders: <br /> <br />Bidders for the above-referenced project shall take note of the following changes, <br />additions, d~letions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br /> <br />IN THE CONTRACT DOCUMENTS: <br /> <br />1. In Doc~ment 00300, replace in its entirety. <br />2. Add Document 00200 Geotechnical Report. <br />3. Attached Pre-bid minutes to be added to contract documents. <br />4. In resp.onse to bidders RFI'S: <br />JVA Enqineerinq: <br />a) Well box and location? <br />Response: . Design change to use a Vortech-Model 5000 in lieu of <br />drainage well. <br />b) If 6" force main is connect to the bridge or with pile supports Sta. 122+33 <br />& Sta. 124+13. <br />Response: The existing two bridges are relatively new and provide <br />a conduit chase for the force main. (see attached details) <br />c) If propose storm drainage is RCP or HOPE, and where? <br />Response: All drainage pipes under pavement shall be Rep. HDPE <br />will be allowed in grass areas. (see revised bid item form) <br />d) If a propose striping and signage plan will be provided? <br />Response: Striping and signage plans are complete and will be sent <br />as an addendum. <br />e) Locations of light poles with pull box. <br />Response: Electrical plans are complete and will be sent as an <br />addendum. <br /> <br />Southeastern Enqineerinq: <br />a) Item 8 of the bid form calls for relocation of power / light poles. We could <br />only find one pole at Station 106+60 that needs to be removed. Please <br />clarify? <br /> <br />\ <br /> <br />04/08 Final Version <br /> <br />00900-1 <br /> <br />05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.