Laserfiche WebLink
<br />r-, <br /> <br />. <br /> <br />,., <br />. <br /> <br />TABLE 6 <br />Property Target Range Tolerance <br />Slump (Non-Drilled Shaft Concrete without :t 0.75 inch [:t20 mm] :t 1.5 inch [:t40 <br />HRWR) mm] <br />Slump (Non-Drilled Shaft Concrete with 1 .0 inch [:t25 mm] :t 1.5 inch [:t40 <br /> :t <br />HRWR) mm] <br />Slump (Drilled Shaft Concrete) 1.0 inch [:J:25 mm] :t 1.0 inch [:t25 <br />:t mm] <br />Air Content As shown in the range in Table 2 <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />r"1 <br /> <br />Reject concrete with slump or air content exceeding the above tolerances. <br />Do not allow concrete to remain in a transporting vehicle to reduce slump. Water may be <br />added only upon arrival of the concrete to the job site and not thereafter. <br />If the slump of non-drilled shaft concrete varies from the target value in <br />excess of 0.75 inch [20 mm] (1 inch [25 mm] for concrete containing HRWR), immediately <br />adjust the concrete mixture to correct the slump of succeeding batches. The Engineer will <br />allow a reasonable time for adjustment, taking into consideration trucks already in route <br />from the concrete production facility. If the Contractor does not implement adjustments at <br />the earliest possible time, the Engineer will reject the concrete and terminate further <br />production until the Contractor makes corrections. <br /> <br />. <br /> <br />., <br />. <br /> <br />Ii <br />. <br /> <br />,., <br />. <br /> <br />346-7 Mixing and Delivering Concrete. <br />346-7.1 General Requirements: Operate all concrete mixers at speeds and volumes <br />per the manufacturer's design or recommendation as stipulated on the mixer rating plate. <br />346-7.2 Transit Mixing: When water is added at the job site, mix the concrete 30 <br />additional mixing revolutions. When mixing for the purpose of adjusting consistency, do <br />not allow the total number of revolutions at mixing speed to exceed 160. Discharge all <br />concrete from truck mixers before total drum revolutions exceed 300. <br />346-7.3 Mixing at the Site: Use a mixer of sufficient capacity to prevent delays that <br />may be detrimental to the quality of the work. Ensure that the accuracy of batching <br />equipment is in accordance with requirements of this Section. <br />346-7.4 Concreting in Cold Weather: Do not mix concrete when the air temperature <br />is below 450F [7OC] and falling. The Contractor may mix and place concrete when the air <br />temperature in the shade, and away from artificial heat, is 400F [40C] and rising. Protect <br />the fresh concrete from freezing until the concrete reaches a minimum compressive <br />strength of 1,500 psi [10 MPa] unless the concrete is to be heat cured. <br />346-7.5 Concreting in Hot Weather: Hot weather concreting is defined as the <br />production, placing and curing of concrete when the concrete temperature at placing <br />exceeds 850F [300C] but is less than 1000F [40oC]. <br />Unless the specified hot weather concreting measures are in effect reject <br />concrete exceeding 850F [300C] at the time of placement. Regardless of special measures <br />taken, reject concrete exceeding 1000F [40oC]. Predict the concrete temperatures at <br />placement time and implement hot weather measures to avoid production shutdown. <br />346-7.6 Transit Time: Ensure compliance with the following maximum allowable <br />time between the initial introduction of water into the mix and depositing the concrete in <br />place: <br /> <br />" <br />. <br /> <br />., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />,..., <br />. <br /> <br />II <br /> <br />. <br /> <br />.... <br /> <br />. <br /> <br />-.. <br /> <br />09/09 <br /> <br />01000-100 <br /> <br />03-4122.F <br /> <br />- <br />