My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />TABLE 7 <br />Non-Agitator Trucks Agitator Trucks <br />45 minutes 60 minutes <br />75 minutes* 90 minutes* <br />*When a water reducing and retarding admixture (Type D or Type G) is used. <br /> <br />" <br />. <br /> <br />. <br /> <br />,..., <br /> <br />346-7.7 Adding Water To Concrete at the Placement Site: Perform an initial slump <br />before the addition of water at the job site. After adjusting the slump, perform a test to <br />confirm that the slump of the concrete is within the target range as defined in Table 6. If <br />the slump exceeds the target range but is within the tolerance range, that load may be <br />accepted, but water added at the site will be reduced to maintain a slump within the target <br />range on successive loads. If the slump is delivered within the target range, no water will <br />be added to the load. Confirm with another test that the next load is within the target <br />range after the addition of water at the placement site. Repeated incidents of concrete <br />being placed outside the target range will result in revocation of that portion of the QCP. <br />No concrete represented by plastic test results outside of the tolerance range will be <br />accepted for placement. <br />346-7.8 Sample Location: Obtain samples from the point of final placement. <br />Where concrete buckets are used to discharge concrete directly to the point <br />of final placement or into the hopper of a tremie pipe, samples will be obtained from the <br />discharge of the bucket. When the concrete is discharged directly from the mixer into the <br />bucket, with a minimal lapse of time before discharge of the bucket, samples may be <br />obtained from the discharge of the mixer. <br />Where conveyor belts, troughs, pumps, or chutes are used to transport <br />concrete directly to the point of final placement or into the hopper of a tremie pipe, <br />samples will be obtained from the discharge end of the entire conveyor belt, trough, pump, <br />or chute system. <br />Where concrete is placed in a drilled shaft or other element using a tremie <br />pipe and a concrete pump, samples will be obtained from the discharge of the pump line at <br />the location of the tremie hopper. <br />Where a concrete pump is used to deposit concrete directly into a drilled <br />shaft which is a wet excavation without the use of a tremie, ensure the discharge end of <br />the pump line remains immersed in the concrete at all times after starting concrete <br />placement, and the following procedure is followed: <br />a. Obtain initial samples from the discharge of the pump line using the <br />full length of pump line which will be required to start the placement. Ensure the plastic <br />properties of the concrete sampled from the discharge of the pump line are within the <br />target range. Obtain comparative initial samples from the discharge of the mixer delivering <br />concrete to the pump in order to control the plastic properties of the mix. <br />b. Obtain all other samples from the discharge of the mixer delivering <br />concrete to the pump. Ensure the plastic properties of the concrete being delivered to the <br />pump are within the allowable tolerance, except when necessary and approved by the <br />engineer and based on comparative testing, to provide concrete meeting the Specification <br />requirements at the end of the pump line. <br />Describe concrete placement and sampling methods in the QCP. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />11 <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />. <br /> <br />"'"'l <br /> <br />. <br /> <br />I.., <br /> <br />. <br /> <br />" <br />. <br /> <br />" <br />. <br /> <br />r, <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01 000-1 01 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.