My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />r""'I <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />346-8 Plastic Concrete Sampling and Testing. <br />QC tests will include air content, temperature, slump, compressive strength <br />cylinders, and may include plastic unit weight. In addition, calculate the water to <br />cementitious materials ratio for compliance to the approved mix design. <br />Ensure that each truck has a valid inspection card issued by the Department, the <br />revolution counter on the mixer is working properly, and calibration of the water dispenser <br />has been performed within the last twelve months and verify batch weights within required <br />limits of the mix design. <br />Perform plastic concrete tests on the initial delivery of each concrete design mix <br />each day. Ensure QC technicians meeting the requirements of Section 105 are present and <br />performing tests throughout the placement operation. Ensure one technician is present and <br />performing tests throughout the placement operation at each placement site. If a <br />placement site has multiple concrete trucks, identify the number of technicians in the <br />Quality Control Plan. If a placement site has multiple trucks placing concrete, then have at <br />least two technicians present at that site. Ensure all equipment utilized meets this <br />Specification. Do not proceed with the placement operation until the delivered concrete <br />complies with plastic properties specified. After placement begins, perform QC tests to <br />ensure compliance with Specification requirements on each LOT of concrete. Reject non- <br />complying loads which cannot be adjusted at the jobsite. Ensure that corrections are made <br />on subsequent loads. <br />Furnish sufficient concrete of each design mix as required by the Engineer for <br />verification testing. When the Engineer's verification tests results do not compare with the <br />QC plastic properties test results, within the limits defined by the Independent Assurance <br />(IA) checklist comparison criteria, disposition of the concrete will be at the option of the <br />Contractor. <br />If a QC test fails, reject the remainder of that load, terminate the LOT, and notify <br />the Engineer. Make cylinders representing that LOT from the same sample of concrete. <br />Following termination of a LOT, re-initiate initial plastic properties tests until such <br />time as the water to cementitious materials ratio, air content, temperature and slump <br />comply with the Specification requirements. Initiate a new LOT once the testing indicates <br />compliance with Specification requirements. <br />When three consecutive LOTs, or when five LOTs in two days of production of the <br />same design mix are outside the specified tolerances, suspend production. Make the <br />necessary revisions to concrete operations and increase the frequency of QC testing in the <br />QCP to bring the concrete within allowable tolerances. Obtain the Engineer's approval of <br />the revisions before resuming production. After production resumes, obtain the Engineer's <br />approval before returning to the normal frequency of QC testing. <br />If concrete placement stops for more than 90 minutes, perform initial plastic <br />properties testing on the next batch and continue the LOT. Cylinders cast for that LOT will <br />represent the entire LOT. <br />The Department may perform Independent Verification testing at any time to <br />evaluate the QC of the concrete. The comparison between the Independent Verification <br />testing and the QC testing is identified in the IA Checklist Criteria. When a test does not <br />compare, the Contractor will revise the QCP as deemed necessary by the Engineer. The <br />Department reserves the right to notify the IA to review the testing procedures and <br />equipment. <br /> <br />., <br />. <br /> <br />...., <br />. <br /> <br />, <br />. <br /> <br />II <br />. <br /> <br />n <br />I <br /> <br />,.., <br />. <br /> <br />I <br /> <br />" <br />. <br /> <br />r'1 <br /> <br />. <br /> <br />,.., <br />. <br /> <br />I I <br /> <br />. <br /> <br />r"""l <br /> <br />. <br /> <br />r"""l <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />r'1 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />r- I <br /> <br />09/09 <br /> <br />01000-102 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.