Laserfiche WebLink
<br />II <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />346-9 Acceptance Sampling and Testing. <br />346-9.1 General: Perform plastic properties test as per 346-8 and cast a set of <br />three QC cylinders for each LOT of structural concrete incorporated into the project. Take <br />these acceptance samples randomly for each LOT as determined by a random number <br />generator (acceptable to the Department). The Department will independently perform <br />plastic properties test and cast a set of verification cylinders from a separate sample from <br />the same load of concrete as the Contractor's QC sample. For each LOT verified by the <br />Department, cast one additional cylinder from the same sample, and identify it as the QC <br />"hold" cylinder. The Department will also cast one additional "hold" cylinder from each <br />verification sample. Provide curing facilities for initial curing that have the capacity to hold <br />all QC, Verification, and Independent Verification cylinders simultaneously. All cylinders <br />will be clearly identified. Deliver the QC samples to the final curing facility in accordance <br />with ASTM C 31 [ASTM C 31 M]. At this same time, the Department will deliver the <br />verification samples to their final curing facility. <br />Test the QC samples for compressive strength at the age of 28 days in a <br />laboratory meeting and maintaining at all times the qualification requirements listed in 6-9. <br />The QC testing laboratory will input the compressive strength test results <br />into the Department's sample tracking database within 24 hours. When the QC testing <br />laboratory cannot input the compressive strength test results into the Department's sample <br />tracking database within 24 hours, the QC testing laboratory will notify the Verification <br />testing laboratory within 24 hours of breaking the cylinder and provide the Verification <br />testing laboratory the compressive strength test results. Ensure the compressive strength <br />results are input into the Department's sample tracking database within 72 hours of <br />determining the compressive strength of the cylinders. <br />The Department will average the QC and Verification compressive strength <br />test data and based on this average at 28 days determine the Comparison Criteria as <br />shown in Table 8. When the difference between QC and Verification are less than or equal <br />to the Comparison Criteria, the QC data is verified. When the difference between QC and <br />verification data exceeds the Comparison Criteria the Engineer will initiate the resolution <br />procedure in accordance with 346-9.5. The QC and Verification laboratories will transport <br />their own hold cylinder to the resolution testing laboratory within 72 hours after the <br />Engineer notifies the Contractor that a resolution is required. <br /> <br />. <br /> <br />,.., <br />. <br /> <br />..., <br />. <br /> <br />n <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />" <br />. <br /> <br />.-, <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br /> <br />,., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />1""'1 <br /> <br />Table 8 <br />Range of Average Compressive Strength Comparison Criteria <br />Less than 3500 psi [23 MPa] 420 psi [2.9 MPa] <br />3,501 - 4,500 psi [23 - 31 MPa] 590 psi [4.0 MPa] <br />4,501 - 6,500 psi [31 - 45 MPa] 910 psi [6.3 MPa] <br />6,501 - 8,500 psi [45 - 59 MPa] 1,275 psi [8.8 MPa] <br />Greater than 8,500 psi [59 MPa] 1,360 psi [9.4 MPa] <br /> <br />. <br /> <br />" <br />. <br /> <br />.., <br />. <br /> <br />,., <br /> <br />r"'1 <br /> <br />346-9.2 Sampling Frequency for Quality Control Tests: <br />As a minimum, sample and test concrete of each design mix for water to <br />cementitious materials ratio, air content, temperature, slump and compressive strength in <br />accordance with Table 9. The Engineer will randomly verify one of every four consecutive <br />LOTs of each design mix based on a random number generator, and may perform <br />additional Independent Verification tests. All QC activities, calculations, and inspections <br /> <br />. <br /> <br />. <br /> <br />.... <br /> <br />. <br /> <br />r"'I <br /> <br />09/09 <br /> <br />01000-103 <br /> <br />03-4122.F <br /> <br />. <br />