My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br />. <br /> <br />II <br /> <br />. <br /> <br />1"'"1 <br /> <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />.., <br /> <br />. <br /> <br />" <br />. <br /> <br />..., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />,., <br />. <br /> <br />.., <br /> <br />. <br /> <br />r""'I <br /> <br />- <br /> <br />the Department. The Engineer may also require the Contractor to perform additional <br />strength testing as necessary to determine structural adequacy of the concrete. <br />Furnish either a structural analysis performed by the Contractor's Engineer of <br />Record to establish strength adequacy or drilled core samples as specified in 346-10.3 to <br />determine the in-place strength of the LOT of concrete in question at no additional expense <br />to the Department. Obtain the Engineers approval before taking any core samples. When <br />the concrete is deemed to have low strength, obtain and test the cores and report the data <br />to the Engineer within 14 days of the 28 day compressive strength tests. Core strength <br />test results obtained from the structure will be accepted by both the Contractor and the <br />Department as the in-place strength of the LOT of concrete in question. The core strength <br />test results will be final and used in lieu of the cylinder strength test results for <br />determination of structural adequacy and any pay adjustment. The Department will <br />calculate the strength value to be the average of the compressive strengths of the three <br />individual cores. This will be accepted as the actual measured value. <br />346-10.2 Determination of Structural Adequacy: If core strength test results are <br />less than 500 psi [3.5 MPa] or 10%, whichever is greater, below the specified minimum <br />strength, consider the concrete represented by the cores structurally adequate. If the core <br />strength test results are more than 10% or 500 psi [3.5 MPa], whichever is greater, below <br />the specified minimum strength, the Department will consider the concrete represented by <br />the cores structurally questionable. Submit a structural analysis performed by the <br />Contractor's Engineer of Record. If the results of the structural analysis, approved by the <br />Department, indicates adequate strength to serve its intended purpose with adequate <br />durability, the Contractor may leave the concrete in place subject to the requirements of <br />346-11, otherwise, remove and replace the LOT of concrete in question at no additional <br />expense to the Department. <br />346-10.3 Coring for Determination of Structural Adequacy: Furnish three <br />undamaged core samples taken from the same approximate location as where the <br />structural questionable concrete represented by the low strength concrete test cylinders <br />was placed. Select the location of the drilled cores so that the structure is not impaired and <br />does not sustain permanent damage after repairing the core holes. Obtain the approval of <br />the Engineer to core, and of the core location prior to drilling. <br />346-10.4 Core Conditioning and Testing: The Department will test the cores in <br />accordance with ASTM C 42 [ASTM C 42M]. The Engineer will make the determination <br />whether to test the cores in a dry or wet condition. If the Engineer decides to test the <br />cores in a wet condition, immerse the cores in water for at least 40 hours, and test the <br />cores wet. The cores will be tested within 3-days after obtaining the samples. <br /> <br />346-11 Pay Adjustments for Low Strength Concrete. <br />346-11.1 General: Any LOT of concrete failing to meet the specified minimum <br />strength as defined in 346-3, 346-9,346-10 and satisfactorily meeting all other <br />requirements of the Contract Documents, including structural adequacy, the Engineer will <br />individually reduce the price of each low strength LOT in accordance with this Section. <br />346-11.2 Basis for Pay Adjustments: When an acceptance strength test result falls <br />more than 10% or 500 psi [3.5 MPa], whichever is greater, below the specified minimum <br />strength, core samples may be obtained from the respective LOT of concrete represented <br />by the low acceptance strength test result for determining pay adjustments. Price <br />adjustment will be applied to the certified invoice price the Contractor paid for the <br />concrete. <br /> <br />09/09 <br /> <br />01000-106 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.