My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />f' e (t) = Average Core Strength at time t (psi) <br /> <br />,.., <br /> <br />t = time compressive strength was measured (days) <br /> <br />. <br /> <br />346-11.6.3 Slag-Cement Concrete: <br />Equivalent 28-day compressive strength = f'e (28), where: <br /> <br />f'e (28) = 0.794x f'e (t)x )7.~6r06 <br /> <br />f'e (28) = 0.730x f'e (t)x )6.~2r747 <br /> <br />(Type I Cement) <br /> <br />r-, <br />. <br /> <br />.., <br />. <br /> <br />(Type II Cement) <br /> <br />..., <br /> <br />..., <br />. <br /> <br />f'e (28) = 0.826 x f'e (t)x )2.~6r72 (Type III Cement) <br />f'e (t) =Average Core Strength at time t (psi) <br /> <br />. <br /> <br />.., <br />. <br /> <br />t = time compressive strength was measured (days) <br /> <br />346-11.7 Calculating Pay Adjustments: The Engineer will determine payment <br />reductions for low strength concrete, accepted by the Department and represented by <br />either cylinder or core strength test results below the specified minimum strength, in <br />accordance with the following: <br />Reduction in Pay is equal to the reduction in percentage of concrete cylinder <br />strength (specified minimum strength minus actual strength divided by specified minimum <br />strength) . <br />For the elements that payments are based on the per foot [meter] basis, the <br />Engineer will adjust the price reduction from cubic yards [cubic meters] basis to per foot <br />[meter] basis, determine the total linear feet [meter] of the elements that are effected by <br />low strength concrete samples and apply the adjusted price reduction accordingly. <br /> <br />.., <br />. <br /> <br />r-. <br />. <br /> <br />1""1 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />,..., <br /> <br />347 PORTLAND CEMENT CONCRETE - CLASS I (NONSTRUCTURAL). <br />(REV 8-3-05) (FA 8-9-05) (1-06) <br /> <br />. <br /> <br />r'1 <br /> <br />SECTION 347 (Pages 301-304) is deleted and the following substituted: <br /> <br />. <br /> <br />.., <br /> <br />SECTION <br />PORTLAND CEMENT CONCRETE - CLASS I <br /> <br />(NONSTRUCTURAL) <br /> <br />347 <br /> <br />. <br /> <br />r"1 <br />. <br /> <br />347-1 Description. <br />The requirements of this Section are applicable to concrete designated as Class I <br />(Nonstructural), hereinafter referred to as concrete. Use concrete composed of a mixture of <br />portland cement, aggregates, and water, with or without chemical admixtures, slag, or <br />pozzolanic materials. Deliver concrete to placement site in a freshly mixed, unhardened <br /> <br />,.., <br /> <br />. <br /> <br />...... <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-108 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.