Laserfiche WebLink
<br />,.., <br /> <br />. <br /> <br />-I <br /> <br />..., <br /> <br />Apply the galvanizing compound to attain a uniform appearance free from all <br />defects or failures. Submit repair procedure(s) to the Engineer for approval. All deficiencies <br />will be corrected at no cost to the Department. <br /> <br />. <br /> <br />. <br /> <br />..., <br /> <br />562-4 Basis of Payment. <br />No direct payment will be made for galvanizing compound coating of welded <br />surfaces or for field repair of damaged galvanized surfaces. Include the cost to perform <br />these operations, in the Contract price for the item which includes the member being so <br />treated. <br /> <br />. <br /> <br />.., <br />. <br /> <br />..., <br /> <br />575 SODDING. <br />(REV 1-5-04) (FA 1-8-04) (7-04) <br /> <br />. <br /> <br />,.., <br /> <br />SECTION 575 (Pages 668-670) is deleted and the following substituted: <br /> <br />. <br /> <br />r"'1 <br />. <br /> <br />SECTIO N <br />SODDING <br /> <br />575 <br /> <br />,.., <br />. <br /> <br />575-1 Description. <br />Establish a stand of grass within the specified areas, by furnishing and placing sod, <br />and rolling, fertilizing, watering, and maintaining the sodded areas to ensure a healthy <br />stand of grass. <br /> <br />., <br />. <br /> <br />. <br /> <br />575-2 Materials. <br />Meet the following requirements: <br /> <br />Sod ...... ................. ................................... ..............981-2 <br /> <br />Fertilizer, Type I................................................ Section 982 <br /> <br />Water... .......................................................... Section 983 <br /> <br />,.., <br /> <br />,.., <br /> <br />. <br /> <br />575-3 Construction Methods. <br />575-3.1 Preparation of Ground: Fertilize at the rate as shown in Section 570. <br />Scarify or loosen the areas requiring sod to a depth of 6 inches [150 mm]. On areas where <br />the soil is sufficiently loose, particularly on shoulders and fill slopes, the Engineer may <br />authorize the elimination of the ground preparation. Limit preparation to those areas that <br />can be sodded within 72 hours after preparation. Prior to sodding, thoroughly water areas <br />and allow water to percolate into the soil. Allow surface moisture to dry before sodding to <br />prevent a muddy soil condition. <br />575-3.2 Placing Sod: Place sod immediately after ground preparation. Do not use <br />sod which has been cut for more than 72 hours. Stack all sod that is not planted within 24 <br />hours after cutting and maintain proper moist condition. <br />Do not sod when weather and soil conditions are unsuitable for proper <br />results. Pre-wet the area prior to placing sod. Do not place sod on eroded or washed out <br />sites. <br />Place the sod on the prepared surface, with edges in close contact, and <br />embed it firmly and smoothly by light tamping with appropriate tools. <br /> <br />. <br /> <br />.., <br /> <br />I""'J <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />" <br />. <br /> <br />II <br /> <br />09/09 <br /> <br />01000-140 <br /> <br />03-4122.F <br /> <br />- <br />