My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />. <br /> <br />..., <br /> <br />, <br /> <br />Place the sod to the edge of all the paving and shrub areas and 1 inch [25 <br />mm] below adjoining pavement with an even surface and edge. Place rolled sod parallel <br />with the roadway and cut any exposed netting even with the sod edge. <br />Roll using a lightweight turf roller. Provide a true and even surface without <br />any displacement of the sod or deformation. <br />Where sodding in drainage ditches, stagger the setting of the sod pieces to <br />avoid a continuous seam along the line of flow. Ensure that the offsets of individual strips <br />do not exceed 6 inches [150 mm]. Tamp the outer pieces of sod to produce a featheredge <br />effect. <br />Peg sod at locations where the sod may slide. Drive pegs through sod blocks <br />into firm earth, at intervals approved by the Engineer. <br />Remove any sod as directed by the Engineer. <br />575-3.3 Watering: Thoroughly water the sod immediately after placing. Do not <br />water in excess of 1 inch [25 mm] per week for establishment. <br />575-3.4 Maintenance: Maintain the sodded areas in a satisfactory condition until <br />final acceptance of the project. Include in such maintenance the filling, leveling, and <br />repairing of any washed or eroded areas, as may be necessary. The Department will pay <br />for resodding necessary due to factors determined to be beyond the control of the <br />Contractor. <br />Mow the sodded areas to a height of 6 inches [150 mm] when competing <br />vegetation height exceeds 20 inches [500 mm] in height. <br />Monitor placed sod for growth of pest plants and noxious weeds. If pest <br />plants and/or noxious weeds manifest themselves within 30 days of placement of the sod, <br />treat affected areas by means acceptable to the Department at no expense to the <br />Department. If pest plants and/or noxious weeds manifest themselves after 30 days from <br />date of placement of sod, the Engineer, at his sole option, will determine if treatment is <br />required and whether or not the Contractor will be compensated for such treatment. If <br />compensation is provided, payment will be made as unforeseeable work as described in 4- <br />4. <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />., <br />. <br /> <br />., <br />. <br /> <br />.., <br /> <br />. <br /> <br />" <br />. <br /> <br />I' <br /> <br />. <br /> <br />. <br /> <br />., <br />. <br /> <br />..., <br /> <br />. <br /> <br />M <br /> <br />. <br /> <br />575-4 Method of Measurement. <br />The quantities to be paid for will be for the following items, completed and <br />accepted: <br /> <br />-. <br /> <br />.., <br /> <br />(1) The area, in square yards [square meters], of sodding. <br />(2) The weight, in tons [metric tons], of fertilizer. <br />(3) The volume, in thousand gallons [kiloliters], of water. <br />(4) The area, in acres [hectares], of mowing. <br /> <br />. <br /> <br />. <br /> <br />.., <br /> <br />575-5 Basis of Payment. <br />Prices and payments will be full compensation for all work and materials specified in <br />this Section, and the satisfactory disposal of excavated material, except the furnishing of <br />the fertilizer, and the furnishing and application of the water. <br />Fertilizer and water will be paid for as specified in 570-6. <br />The work and materials for pegging of sod, directed by the Engineer (as provided in <br />575-3.2), will be paid for as Unforeseeable Work. <br />Payment will be made under: <br />Item No. 104- 4- Mowing - per acre. <br />Item No. 2104- 4- Mowing - per hectare. <br /> <br />,.., <br /> <br />. <br /> <br />r'l <br />. <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />., <br /> <br />09/09 <br /> <br />01 000-1 41 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.