My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />. <br /> <br />..., <br /> <br />Apply traffic stripes and markings only to dry surfaces, and when the <br />ambient air and surface temperature is at least 400F [50C] and rising. Do not apply traffic <br />stripes and markings when winds are sufficient to cause spray dust. <br />Apply traffic stripes and markings, having well defined edges, over existing <br />pavement markings such that not more than 2 inches [50 mm] on either end and not more <br />than 1 inch [25 mm] on either side is visible. <br />Mix the paint thoroughly prior to pouring into the painting machine. Apply <br />paint to the pavement by spray or other means approved by the Engineer. <br />Conduct field testing in accordance with FM 5-541 and 5-579. Remove and <br />replace traffic stripes and markings not meeting the requirements of this Section at no <br />additional cost to the Department. <br />Apply all pavement markings prior to opening the road to traffic. <br />710-4.1.1 Final Surface: Painted Pavement Markings (Final Surface) will <br />include two applications of painted pavement markings and one application of retro- <br />reflective pavement markers applied to the final surface. Apply all retro-reflective pavement <br />markers meeting the requirements of Section 706. <br />710-4.2 Thickness: Apply paint to attain a minimum wet film thickness in <br />accordance with the manufacturer's recommendations. <br />710-4.3 Retroreflectivity: Apply white and yellow pavement markings that will <br />attain an initial retroreflectance of not less than 300 mcd/lx.m2 and not less than <br />250 mcd/lx'm2, respectively. Measure, record and certify on a Department approved form <br />and submit to the Engineer, the retroreflectivity of white and yellow pavement markings in <br />accordance with Florida Method FM 5-579. <br />The Department reserves the right to test the markings within 3 days of <br />receipt of the Contractor's certification. Failure to afford the Department opportunity to <br />test the markings will result in non-payment. The test readings should be representative of <br />the Contractor's striping performance. If the retroreflectivity values measure below values <br />shown above, the striping will be reapplied at the Contractor's expense. <br />For work zone markings, ensure that the minimum retroreflectance of white <br />and yellow pavement markings are not less than 1 50 mcd/lx' m2. If the retroreflectivity <br />values fall below the 150 mcd/lx'm2 value within six months of initial application, the <br />striping will be reapplied at the Contractor's expense. <br />710-4.4 Color: Use paint material that meet the requirements of 971-1. <br />710-4.5 Glass Spheres: Apply glass spheres on all pavement markings immediately <br />and uniformly following the paint application. The rate of application shall be based on the <br />manufacturer's recommendation. <br /> <br />. <br /> <br />, <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />f"1 <br />. <br /> <br />-, <br />. <br /> <br />.., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />710-5 Tolerances in Dimensions and in Alignment. <br />Establish tack points at appropriate intervals for use In aligning stripes, and set a <br />stringline from such points to achieve accuracy. <br />710-5.1 Dimensions: <br />710-5.1.1 Longitudinal Lines: Apply painted skip line segments with no more <br />than :!:: 12 inches [:!:: 300 mm] variance, so that over-tolerance and under-tolerance lengths <br />between skip line and the gap will approximately balance. Apply longitudinal lines at least <br />2 inches [50 mm] from construction joints of portland cement concrete pavement. <br />710-5.1.2 Transverse Markings, Gore Markings, Arrows, and Messages: <br />Apply paint in multiple passes when the marking cannot be completed in one pass, with an <br />overall line width allowable tolerance of :!:: 1 inch [:!:: 25 mm]. <br /> <br />. <br /> <br />.., <br /> <br />...., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />r-'1 <br /> <br />. <br /> <br />09/09 <br /> <br />01000-158 <br /> <br />03-4122.F <br /> <br />.., <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.