My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />710-10 Method of Measurement. <br />The quantities to be paid for under this Section will be as follows: <br />(a) The net length, in feet [meters], of each of the various types of lines and <br />stripes, authorized and acceptably applied. <br />(b) The total traversed distance in gross miles [kilometers] of 10-30 skip line. <br />The actual applied line is 25 % of the traverse distance for a 1:3 ratio. This equates to <br />1,320 feet [250 m] of marking per mile [kilometer] of single line. <br />(c) The length, in net miles [net kilometers], of Solid Traffic Stripe, <br />authorized and acceptably applied. <br />(d) The number of pavement messages, symbols and directional arrows, <br />authorized and acceptably applied. <br />(e) The length, in gross miles [kilometers], of Alternating Skip Traffic Stripe, <br />authorized and acceptable applied. <br />(f) Lump Sum, as specified in 710-4.1.1 when the item for Painted Pavement <br />Markings (Final Surface) is included in the proposal. <br />The net length, in feet [meters] of dotted and skip stripes other than 10-30 [3m-9m] <br />will be measured as the distance from the beginning of the first painted stripe to the end of <br />the last painted stripe with proper deductions made for unpainted intervals as determined <br />by plan dimensions or stations, subject to 9-1.3. Unpainted intervals will not be included in <br />pay quantity. <br />The gross-mile [gross-kilometer] measurement of 10-30 Skip Traffic Stripes will be <br />taken as the distance from the beginning of the first painted stripe to the end of the last <br />painted stripe, and will include the unpainted intervals. It will not include any lengths of <br />unpainted intervals which, by design or by other intent of the Department, are greater than <br />30 feet [9 m]. Final measurement will be determined by plan dimensions or stations, <br />subject to 9-1.3.1. <br /> <br />..., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />-. <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />-. <br />. <br /> <br />" <br />. <br /> <br />-, <br /> <br />710-11 Basis of Payment. <br />710-11.1 General: Prices and payments will be full compensation for all work <br />specified in this Section, including, all cleaning and preparing of surfaces, furnishing of all <br />materials, application, curing and protection of all items, protection of traffic, furnishing of <br />all tools, machines and equipment, and all incidentals necessary to complete the work. <br />Final payment will be withheld until all deficiencies are corrected. <br />710-11.2 Lump Sum Payment: When the item for Painted Pavement Markings (Final <br />Surface) is included in the proposal, price and payment will be full compensation two <br />applications of all painted pavement markings applied to the final surface, and one <br />application of retro-reflective pavement markers applied to the final surface in accordance <br />with Section 706. <br />Payment will be made under: <br />Item No. 710- 6- Directional Arrow, Painted - each. <br />Item No. 2710- 6- Directional Arrow, Painted - each. <br />Item No. 710- 7- Pavement Messages, Painted - each. <br />Item No. 2710- 7- Pavement Messages, Painted - each. <br />Item No. 710- 21- Skip Traffic Stripe (White/Black) - per gross mile. <br />Item No. 2710- 21- Skip Traffic Stripe (White/Black) - per gross kilometer. <br />Item No. 710- 22- Skip Traffic Stripe (Yellow) - per gross mile. <br />Item No. 2710- 22- Skip Traffic Stripe (Yellow) - per gross kilometer. <br />Item No. 710- 23- Solid Traffic Stripe (White/Black) - per net mile. <br /> <br />..., <br /> <br />. <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />" <br />. <br /> <br />r-I <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01000-160 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.