My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />. <br /> <br />.., <br /> <br />Dynamic Shear G'sin 0, <br />Rheometer, AASHTO 10 rad/sec. @ 250C Maximum 5,000 kPa <br />T315 <br />Creep Stiffness, S (Stiffness), @ 60 sec. @ -12OC Maximum 300 Mpa <br />AASHTO T31 3 M-value, @ 60 sec. @ -12OC Minimum 0.300 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />,., <br /> <br />916-1.3.5 Notification and Evaluation: In the event that a Specification <br />Compliance test is outside specification requirements or a Quality Control test is outside <br />limits established by the supplier as part of his Quality Control Program shipments of that <br />product to Department projects will cease immediately and the Contractor and the State <br />Materials Office will be notified and the product retested for Specification Compliance <br />(resampling as appropriate). Where the retest for Specification Compliance meets all <br />requirements, shipments of that product may resume. Where off-specification material has <br />been shipped and the retest confirms the original test, the Contractor and State Materials <br />Office will be informed of the steps taken to achieve specification compliance on the <br />product shipped. <br />Where off-specification materials has been shipped, further shipment <br />of that product to Department projects shall remain suspended until the cause of the <br />problem is evaluated and corrected by the supplier to the satisfaction of the State <br />Materials Engineer. <br />916-1.3.6 Certification and Verification: <br />The supplier shall furnish certification on the bill of lading for each <br />shipment of PG binder delivered to a Department project that includes: the quantity, the <br />Superpave PG asphalt binder grade (including QPL number), PG binder LOT, a statement <br />that the binder is in conformance with 916-1 and the suppliers Quality Control Program, <br />and the quantity of silicone and anti-strip agent addition as applicable, including product <br />designation (QPL number as applicable). Any special handling or temperature requirements <br />shall be indicated on the certification and are solely the responsibility of the Contractor to <br />follow. <br />The Department may sample and test PG binder from the suppliers <br />storage tank, the delivery vehicle, and/or Contractors storage tank to verify and determine <br />compliance with this and other specification requirements. Where these tests identify <br />material outside specification requirements, the State Materials Engineer may require the <br />supplier to cease shipment of that PG binder product. Further shipment of that PG binder <br />product to Department projects may remain suspended until the cause of the problem is <br />evaluated and corrected by the supplier as necessary to the satisfaction of the State <br />Materials Engineer. <br /> <br />. <br /> <br />r-'I <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />Pl <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />rl <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />-, <br /> <br />. <br /> <br />916-2 Recycling Agents. <br />916-2.1 Requirements: The asphalt recycling agent (RA) shall be an asphalt cement <br />(PG asphalt binder) or an asphalt cement blended (as necessary) with a softening agent or <br />flux oil, and shall meet the following requirements: <br /> <br />..., <br />. <br /> <br />1"1 <br />. <br /> <br />r-, <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01000-166 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.