My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />. <br /> <br />., <br /> <br />-, <br /> <br />RECYCLING AGENTS <br /> Recycling Agent <br /> Minimum/Maximum <br />Test Conditions Value <br />Viscosity -P (Pa's) 1400F [600C] Target Viscosity ::!: 20% <br />Viscosity Ratio Visco 1400F [600C] after TFOT <br />(Residue from Thin Film Visco 1400F [600C] before TFOT maximum 3 <br />Oven Test) <br />Smoke Point COC minimum 2600F [125OC] <br />Flash Point COC minimum 4000F [205OC] <br />Solubility in Trichlorethylene minimum 97.5% <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br />. <br /> <br />, <br /> <br />Rack blending of recycling agents (blending from two RA tank sources) will <br />be permitted to meet a required target viscosity value. <br />Silicone shall be added to the recycling agent at a rate of 25 cm3 for each <br />5,000 gallons [19 m3] of recycling agent. If a dispersing fluid is used in conjunction with <br />the silicone, the resultant mixture containing the full 25 cm3 shall be added, in accordance <br />with the manufacturer's recommendation. The blending of silicone mixture with the residue <br />shall be done by the supplier prior to shipment. <br />The recycling agent shall contain 0.5% heat-stable anti-strip additive by <br />weight of asphalt from an approved source. The anti-strip additive shall meet the <br />requirements of 916-5. The anti-strip additive shall be introduced and mixed into the <br />recycling agent at the terminal. <br />Where a recycling agent is used in mixes containing reclaimed asphalt <br />pavement (RAP), the requirements of 334-2.3.4 must also be met. <br />916-2.2 Sampling and Reporting: Sampling of recycling agents shall be done in <br />accordance with AASHTO T-40. Initial Specification Compliance test results shall be <br />required for each new LOT of material. A new LOT will occur when the material in a tank <br />changes and the Specification Compliance Test may not be representative of the material <br />in the tank. This may be due to an incoming bulk shipment of material, change in refinery <br />run, the manufacture of a product, or a blend of material in a tank. <br />A monthly report by the supplier containing Specification Compliance Test <br />results for each RA LOT shall be submitted by the supplier in electronic format using the <br />form provided by the Department to the State Materials Office within seven days following <br />the end of the calendar month. Copies of these monthly reports and supporting test reports <br />shall be available at the supply location for a minimum of three years. <br />916-2.3 Certification and Verification: The supplier shall furnish certification on the <br />bill of lading for each shipment of recycling agent delivered to a Department project that <br />includes: the quantity, the RA target viscosity, the RA LOT(s), a statement that the RA is <br />in conformance with 916-2, and the quantity of silicone and anti-strip agent addition, <br />including product designation (QPL number as applicable). <br />The Department may sample and test recycling agents from the suppliers <br />storage tank, the delivery vehicle, and/or Contractors storage tank to verify and determine <br />compliance with this and other specification requirements. Where these tests identify <br />material outside specification requirements, the State Materials Engineer may require the <br />supplier to cease shipment of RA binder from that RA LOT(s). Further shipment of RA <br />binder from that RA LOT(s) to Department projects may remain suspended until the cause <br /> <br />., <br /> <br />. <br /> <br />-, <br />. <br /> <br />., <br /> <br />. <br /> <br />~ <br />. <br /> <br />-, <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />~1 <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />. <br /> <br />n <br /> <br />. <br /> <br />-, <br /> <br />09/09 <br /> <br />01 000-1 67 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.