My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />,.., <br /> <br />. <br /> <br />M <br /> <br />r"1 <br />. <br /> <br />(b) The basis for arriving at the amount of the progress certification, less <br />payments previously made and less an amount previously retained or withheld. The basis <br />will include a detail breakdown provided on the certification of items of payment in <br />accordance with 102-13. After the initial setup of the maintenance of traffic items and <br />counts, the interval for recording the counts will be made weekly on the certification sheet <br />unless there is a change. This change will be documented on the day of occurrence. Some <br />items may necessitate a daily interval of recording the counts. <br /> <br />. <br /> <br />.., <br />. <br /> <br />1""1 <br /> <br />102-13 Basis of Payment. <br />102-13.1 Maintenance of Traffic (General Work): When an item of work is included <br />in the proposal, price and payment will be full compensation for all work and costs <br />specified under this Section except as may be specifically covered for payment under other <br />items. <br />102-13.2 Traffic Control Officers: Price and payment will be full compensation for <br />the services of the traffic control officers. <br />102-13.3 Special Detours: Price and payment will be full compensation for <br />providing all detour facilities shown on the plans and all costs incurred in carrying out all <br />requirements of this Section for general maintenance of traffic within the limits of the <br />detour, as shown on the plans. <br />102-13.4 Commercial Materials for Driveway Maintenance: Price and payment will <br />be full compensation for all work and materials specified for this item, including specifically <br />all required shaping and maintaining of driveways. <br />102-13.5 Work Zone Signs: Price and payment will be full compensation for all <br />work and materials for furnishing signs, supports and necessary hardware, installation, <br />relocating, maintaining and removing signs. <br />102-13.6. Business Signs: Price and payment will be full compensation for all <br />materials and labor required for furnishing, installing, relocating, maintaining, and removing <br />the signs as well as the cost of installing any logos provided by business owners. <br />102-13.7 High Intensity Warning Lights: Price and payment will be full <br />compensation for furnishing, installing, operating, relocating, maintaining and removing <br />high intensity flashing lights (Type B). <br />102-13.8 Channelizing Devices: Prices and payment will be full compensation for <br />furnishing, installing, relocating, maintaining and removing the warning devices, including <br />the costs associated with attached warning lights as required. <br />102-13.9 Barrier Wall (Temporary): Price and payment will be full compensation for <br />furnishing, installing, maintaining, and removing the barrier. When called for, Barrier Wall <br />(Temporary) (Relocate) will be full compensation for relocating the barrier. <br />102-13.10 Lights, Temporary, Barrier Wall Mount: Price and payment will be full <br />compensation for all work and materials for furnishing, installing and maintaining the <br />warning lights mounted on barrier wall. Payment will not be made for lights that are <br />improperly placed or are not working. <br />102-13.11 Glare Screen (Temporary): Price and payment will be full compensation <br />for furnishing, installing, maintaining, and removing the glare screen certified as <br />installed/used on the project. When called for, Glare Screen (Relocate) will be full <br />compensation for relocating the glare screen. <br />102-13.12 Temporary Vehicular Impact Attenuator: <br />102-13.12.1 Redirective: Price and payment will be full compensation for <br />furnishing, installing, maintaining and subsequently removing such attenuators. Restoration <br /> <br />'1 <br />. <br /> <br />'1 <br />. <br /> <br />I <br />I <br /> <br />r'1 <br />. <br /> <br />,., <br />. <br /> <br />f'l <br />. <br /> <br />. <br /> <br />r"1 <br />. <br /> <br />I <br /> <br />f'l <br />. <br /> <br />1"1 <br />. <br /> <br />" <br />. <br /> <br />..., <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-14 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.