Laserfiche WebLink
<br />,.., <br /> <br />. <br /> <br />~ <br /> <br />..., <br />. <br /> <br />c. Proposed treatment and/or disposal of all Hazardous <br />Materials/Waste. <br />Transport all hazardous materials/waste in accordance with applicable <br />40 CFR 263 Standards. Provide a copy of all completed Hazardous Materials/Waste <br />manifest/bills of lading to the Engineer within 21 days of each shipment. <br />110-9.5.1 Steel Members With Hazardous Coating: Dispose of steel <br />members with hazardous coating in one of the following manners: <br />(a) Deliver the steel members and other hazardous waste to a licensed <br />recycling or treatment facility capable of processing steel members with hazardous coating. <br />(b) Deliver the steel members with hazardous coating to a site <br />designated by the Engineer for use as an offshore artificial reef. Deliver any other <br />hazardous materials/waste to a licensed hazardous materials/waste recycling treatment <br />facility. <br />Dismantle and/or cut steel members to meet the required dimensions <br />of the recycling facility, treatment facility or offshore artificial reef agency. <br />All compensation for the cost of removal and disposal of hazardous <br />materials/waste will be included in the Cost of Removal of Existing Structures. <br />110-9.5.2 Certification of Compliance: Furnish two copies of Certification of <br />Compliance from the firm actually removing and disposing of the hazardous <br />materials/waste stipulating, the hazardous materials/waste has been handled, transported <br />and disposed of in accordance with this Specification. The Certification of Compliance shall <br />be attested to by a person having legal authority to bind the company. <br />Maintain all records required by this Specification and ensure these <br />records are available to the Department upon request. <br /> <br />. <br /> <br />.., <br />. <br /> <br />,., <br />. <br /> <br />" <br />. <br /> <br />r'1 <br />. <br /> <br />.., <br />. <br /> <br />.., <br />I <br /> <br />r] <br />. <br /> <br />SUBARTICLE 110-10.4 (Page 144) is deleted and the following substituted: <br /> <br />'"1 <br />. <br /> <br />- <br /> <br />110-10.4 Mailboxes: When the Contract Documents require furnishing and installing <br />mailboxes, permit each owner to remove the existing mailbox. Work with the Local <br />Postmaster to develop a method of temporary mail service for the period between removal <br />and installation of the new mailboxes. Install the mailboxes in accordance with the Design <br />Standards. <br /> <br />,.., <br /> <br />.., <br /> <br />. <br /> <br />120 EXCAVATION AND EMBANKMENT. <br />(REV 6-25-04) (FA 6-29-04) (1-05) <br /> <br />...., <br />. <br /> <br />SUBARTICLE 120-9.4 (Page 156) is deleted and the following substituted: <br /> <br />,., <br /> <br />r'1 <br /> <br />120-9.4 Compaction of Subgrade: If the plans do not provide for stabilizing, <br />compact the subgrade (as defined in 1-3) in both cuts and fills to the density specified in <br />120-10.2. For undisturbed soils, do not apply density requirements where constructing <br />narrow widening strips or paved shoulders 5 feet [1.5 m] or less in width. <br />Where trenches for widening strips are not of sufficient width to permit the <br />use of standard compaction equipment, perform compaction using vibratory rollers, trench <br />rollers, or other type compaction equipment approved by the Engineer. <br />Maintain the required density until the base or pavement is placed on the <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />. <br /> <br />.... <br /> <br />subgrade. <br /> <br />. <br /> <br />,.., <br /> <br />09/09 <br /> <br />01000-31 <br /> <br />03-4122.F <br /> <br />. <br />