My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />,.., <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />,., <br />. <br /> <br />"1 <br />. <br /> <br />,., <br />. <br /> <br />fl <br />. <br /> <br />r'1 <br />. <br /> <br />f""l <br /> <br />. <br /> <br />I <br /> <br />,., <br />. <br /> <br />~ <br />. <br /> <br />,., <br />. <br /> <br />r"'1 <br /> <br />. <br /> <br />..... <br /> <br />. <br /> <br />,..., <br /> <br />. <br /> <br />ARTICLE 120-10 (Pages 156-159) is deleted and the following substituted: <br /> <br />120-10 Acceptance Program. <br />120-10.1 General Requirements: <br />120-10.1.1 Initial Equipment Comparison: Before initial production, perform <br />a comparison test using the Quality Control, Verifications and Independent Assurance <br />gauges. Unless the Engineer instructs, do not perform the initial equipment comparison <br />more than once per project. When comparing the computed dry density of one nuclear <br />gauge to a second gauge, ensure that the difference between the two computed dry <br />densities does not exceed 2 PCF [32 kg/m3] between gauges from the same manufacturer, <br />and 3 PCF [48 kg/m3] between gauges from different manufacturers. Repair or replace any <br />Quality Control gauge that does not compare favorably with the IA gauge. <br />Perform a comparison analysis between the Quality Control nuclear <br />gauge and the Verification nuclear gauge any time a nuclear gauge or repaired nuclear <br />gauge is first brought to the project. Repair and replace any Quality Control gauge that <br />does not compare favorably with the Verification gauge at any time during the remainder <br />of the project. Calibrate all Quality Control gauges annually. <br />120-10.1.2 Initial Production Lot: Before construction of any other Lot, <br />prepare an initial control section consisting of one full LOT in accordance with the <br />approved Quality Control Plan for the project. Notify the Engineer at least 24 hours prior to <br />production of the initial control section. Perform all QC tests required in 120-10.1.4. When <br />the initial Quality Control test results pass specifications, the Engineer will perform a <br />Verification test to verify compliance with the specifications. Do not begin constructing <br />another LOT until successfully completing the initial production LOT. The Engineer will <br />notify the Contractor of the initial production lot approval within three working days after <br />receiving the Contractor's Quality Control data when test results meet the following <br />conditions: <br /> <br />Quality Control tests must meet the specifications. <br />Verification test must meet the specifications. <br />Difference between Quality Control and Verification computed Dry <br />Density results shall meet the requirements of 120-10.1.1. <br />If Verification test result fails the density requirements of 120-10.2, <br />correct the areas of non-compliance. The Quality Control and Verification tests will then be <br />repeated. The Engineer will reject the Contractor's Quality Control Plan after three <br />unsuccessful Verification attempts. Submit a revised Quality Control Plan to the Engineer <br />for approval. <br />120-10.1.3 Density over 105%: When a QC computed dry density results in <br />a value greater than 105 % of the applicable Proctor maximum dry density, the Engineer <br />will perform an Independent Verification density test within 5 feet [1.5 meters]. If the <br />Independent Verification density results in a value greater than 105%, the Engineer will <br />investigate the compaction methods, examine the applicable Standard Proctor Maximum <br />Density and material description. The Engineer may collect and test an Independent <br />Verification Standard Proctor Maximum Density sample for acceptance in accordance with <br />the criteria of 120-10.2. <br />120-10.1.4 Quality Control Tests: <br />120-10.1.4.1 Standard Proctor Maximum Density Determination: <br />Determine the Quality Control standard Proctor maximum density and optimum moisture <br /> <br />09/09 <br /> <br />01000-32 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.