<br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />IUnsoaked Bearing Value Required Tolerance <br />ILBR 43 0.0 <br /> <br />ISpecified Bearing Value <br />\LBR 40 <br /> <br />., <br />. <br /> <br />.-, <br />. <br /> <br />160-7.2.2 Mixing Depth Requirements: Do not exceed individual depth <br />tolerance of 2 inches [50 mm] or LOT-average depth tolerance of 1 inch [25 mm]. <br />As an exception to the above mixing requirements, where the <br />subgrade is of rock, the Engineer may waive the mixing operations (and the work of <br />stabilizing), and the Department will not pay for stabilization for such sections of the <br />roadway. <br />160-7.2.3 Density Requirements: <br />160-7.2.3.1 General: Within the entire limits of the width and depth <br />of the areas to be stabilized, other than as provided in 160-7.2.3.2, obtain a minimum <br />density at any location of 98% of the Modified Proctor maximum density as determined by <br />FM 1-T 180, Method D. <br />160-7.2.3.2 Exceptions to Density Requirements: The Contractor <br />need not obtain the minimum density specified in 160-7.2.3.1 if within the following limits: <br />(a) The width and depth of areas which are to be subsequently <br />incorporated into a base course under the same contract. <br />(b) The upper 6 inches [150 mm] of areas to be grassed under <br />the same contract. Compact these areas to a reasonably firm condition as directed by the <br />Engineer. <br />160-7.2.4 Frequency: Conduct QC sampling and testing at a minimum <br />frequency listed in the table below. The Engineer will perform Verification sampling and <br />tests at a minimum frequency listed in the table below. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />..., <br />. <br /> <br />" <br />. <br /> <br />I <br /> <br />..., <br />. <br /> <br />r"1 <br /> <br />Test Name Quality Control Verification <br />Modified Proctor Maximum One per two consecutive One per eight consecutive <br />Density LOTs LOTs <br />Density One per LOT One per four LOTs <br />Limerock Bearing Ratio One per two consecutive One per eight consecutive <br /> LOTs LOTs <br />Stabilizing Mixing Depth Three per LOT One per LOT <br /> <br />.., <br /> <br />. <br /> <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />160-7.3 Additional Requirements: <br />160-7.3.1 Quality Control T estin9: <br />160-7.3.1.1 Bearing Values: Ensure compliance with 160-7.2.1 by <br />sampling and testing the Stabilized Subgrade for determining the Limerock Bearing Ratio <br />(LBR) in accordance with FM 5-515 and 160-7.2.4. Determine test locations including <br />Stations and Offsets, using the Random Number generator provided by the Department, <br />based on the two LOTs under consideration. <br />160-7.3.1.2 Mixing Depth Requirements: Meet required plan mixing- <br />depths by measuring from the proposed Final Grade Line. Ensure compliance with <br />160-7.2.2. Determine test locations including Stations and Offsets, using the Random <br />Number generator provided by the Department. Record results on forms supplied by the <br />Department. <br />160-7.3.1.3 Modified Proctor Maximum Density Requirement: Collect <br />enough material to split and create three separate samples. Retain a Verification sample <br /> <br />I' <br /> <br />. <br /> <br />n <br />. <br /> <br />,., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />r'l <br />. <br /> <br />09/09 <br /> <br />01000-38 <br /> <br />03-4122.F <br />