My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.., <br /> <br />. <br /> <br />" <br /> <br />. <br /> <br />and Resolution sample for the Engineer until the Engineer accepts the eight LOTs <br />represented by the samples. <br />160-7.3.2 Department Verification Tests: <br />160-7.3.2.1 Bearing Value: The Engineer will sample and test the <br />Stabilized Subgrade for determination of the LBR in accordance with FM 5-51 5. The <br />Engineer will select test locations, including Stations and Offsets, using a Random Number <br />generator, based on the eight LOTs under consideration. <br />160-7.3.2.2 Mixing Depth Requirements: The Engineer will measure <br />the mixing depth from the proposed Final Grade Line. The Engineer will select test <br />locations, including Stations and Offsets, using a Random Number generator. <br />160-7.3.2.3 Modified Proctor Maximum Density: The Engineer will <br />randomly select one of the four split samples and test in accordance with FM 1-T 180, <br />Methods D. <br />160-7 .4 Verification Comparison Criteria and Resolution Procedures: <br />160-7.4.1 Bearing Value: If the Department's Verification test meets the <br />requirements of 160-7.2.1, then the Engineer will accept the eight LOTs. Otherwise, the <br />Engineer will obtain one additional sample of material taken from a randomly selected <br />location within the eight LOTs in question. The State Materials Office or an AASHTO <br />accredited laboratory designated by the State Materials Office will perform Resolution <br />testing. The material will be sampled and tested in accordance with FM 5-515. <br />If the Resolution Testing results meet the requirements of 160-7.2.1 <br />then the Engineer will accept the eight LOTs in question, otherwise reprocess all eight <br />LOTs in accordance with 160-5 and retest in accordance with 160-7.3.1.1. <br />160-7.4.2 Mixing Depth Thickness: If the Department's Verification test <br />meets the requirements of 160-7.2.2, then the Engineer will accept that LOT, otherwise <br />retest the LOT at a site within a 5 feet [1.5 meter] radius of the Verification test location <br />and observe the following: <br />1. If the Quality Control retest meets the requirements of 160-7.2.2, <br />then the Engineer will accept that LOT. <br />2. If the QC Re-test confirms shallow depth, re-mix the LOT to an <br />appropriate Depth and re-measure in accordance with 160-7.3.1.2. The Engineer may re- <br />verify in accordance with 160-7.3.2.2. <br />3. If the QC re-test confirms extra deep mixing, conduct an additional <br />QC density test after compaction for the bottom 12 inches [300 mm] of the subgrade for <br />that LOT in addition to the QC Density testing for top 12 inches [300 mm]. The additional <br />Density test must meet the requirements of 1 60-7.2.3. <br />160-7.4.3 Modified Proctor Maximum Density Determination: The Engineer <br />will verify the Quality Control results of the eight consecutive LOTs if the Verification test <br />result compares within 4.5 PCF [72 kg/m3] of the QC result for the corresponding LOTs. <br />Otherwise, the Engineer will collect the Resolution split sample corresponding to the <br />Verification sample tested. The State Materials Office or an AASHTO accredited laboratory <br />designated by the State Materials Office will perform Resolution testing. The material will <br />be sampled and tested in accordance with FM 1-T 180, Method D. <br />The Engineer will compare the Resolution Test results with the <br />Quality Control test results. If the Resolution Test result is within 4.5 PCF [72 kg/m3] of <br />the corresponding Quality Control test result, the Engineer will use the Quality Control test <br />results for material acceptance purposes for each corresponding pair of LOTs. If the <br />Resolution test result is not within 4.5 PCF [72 kg/m3] of the corresponding Quality Control <br /> <br />., <br /> <br />. <br /> <br />,.., <br />. <br /> <br />.., <br />. <br /> <br />.., <br />I <br /> <br />,., <br />. <br /> <br />I' <br /> <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />~ <br /> <br />. <br /> <br />,., <br />. <br /> <br />-, <br />. <br /> <br />,.., <br />. <br /> <br />,.., <br />. <br /> <br />n <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br /> <br />09/09 <br /> <br />01000-39 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.