Laserfiche WebLink
<br />,..., <br /> <br />. <br /> <br />,..., <br />. <br /> <br />test, the Engineer will collect the remaining Verification split samples for testing. <br />Verification Test results will be used for material acceptance purposes for the eight LOTs in <br />question. <br />160-7.4.4 Density: When a Verification or Independent Verification density <br />test does not meet 160-7.2.3 (Acceptance Criteria), retest the LOT at a site within a <br />5 feet [1.5 meter] radius of the Verification test location and observe the following: <br />1. If the Quality Control retest meets the Acceptance Criteria and <br />compares favorably with the Verification or Independent Verification test, the Engineer will <br />accept the four LOTs in question. <br />2. If the Quality Control retest does not meet the Acceptance Criteria <br />and compares favorably with the Verification or Independent Verification test, rework and <br />retest the material in that LOT. The Engineer will re-verify the four LOTs in question. <br />3. If the Quality Control retest and the Verification or Independent <br />Verification test do not compare favorably, complete a new equipment-comparison analysis <br />as defined in 120-10.1.2. Once acceptable comparison is achieved, retest the four LOTs. <br />The Engineer will perform new verification testing. Acceptance testing will not begin on a <br />new LOTs until the Contractor has a gauge that meets the comparison requirements. <br /> <br />..., <br />. <br /> <br />., <br />. <br /> <br />r-, <br /> <br />. <br /> <br />r"'I <br />. <br /> <br />,.., <br />. <br /> <br />,., <br />. <br /> <br />., <br />. <br /> <br />163 BLANKET MATERIAl. <br />(REV 9-7-05) (FA 1-10-06) (7-06) <br /> <br />., <br />. <br /> <br />SECTION 163 (Pages 190 and 191) is deleted. <br /> <br />~ <br />. <br /> <br />200 ROCK BASE. <br />(REV 8-2-05) (FA 8-3-05) (8-05) <br /> <br />.., <br /> <br />. <br /> <br />ARTICLE 200-6 (pages 194-195) is deleted and the following substituted: <br /> <br />.., <br />. <br /> <br />200-6 Compacting and Finishing Base. <br />200-6.1 General: A LOT is defined as a single lift of finished base not to exceed <br />500 feet [150 m]. Shoulders compacted separately shall be considered separate LOTs. <br />Isolated compaction operations will be considered as separate LOTs. For multiple phase <br />construction, a LOT shall not extend beyond the limits of the phase. <br />200-6.1.1 Single Course Base: After spreading, scarify the entire surface, <br />then shape the base to produce the required grade and cross-section, free of scabs and <br />laminations, after compaction. <br />200-6.1.2 Multiple Course Base: Clean the first course of foreign material, <br />then blade and bring it to a surface cross-section approximately parallel to the finished <br />base. Before spreading any material for the upper courses, allow the Engineer to make <br />density tests for the lower courses to determine that the required compaction has been <br />obtained. After spreading the material for the top course, scarify finish and shape its <br />surface to produce the required grade and cross-section, free of scabs and laminations, <br />after compaction. <br /> <br />r'J <br />. <br /> <br />.., <br />. <br /> <br />,., <br /> <br />. <br /> <br />n <br /> <br />. <br /> <br />. <br /> <br />,..., <br /> <br />09/09 <br /> <br />01 000-40 <br /> <br />03-4122.F <br /> <br />. <br />