My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br /> <br />. <br /> <br />,..., <br /> <br />r"I <br /> <br />330-12.4.5.3 Intermediate Layers: Straightedge all intermediate Type <br />SP layers (structural and overbuild) as necessary to construct a smooth pavement. On <br />roadways with a design speed 50 miles per hour [80 km per hour] or greater, when an <br />intermediate Type SP layer will be opened to traffic, straightedge the pavement with a <br />rolling straightedge and correct all deficiencies in excess of 3/8 inch [10 mm] within 72 <br />hours of placement, unless directed otherwise by the Engineer. Correct all deficiencies in <br />accordance with 330-12.5.1. <br />330-12.4.5.4 Final Type SP Structural Layer: Straightedge the final <br />Type SP structural layer with a rolling straightedge, either behind the final roller of the <br />paving train or as a separate operation. The Engineer will verify the straightedge testing by <br />observing the Quality Control straightedging operations. Correct all deficiencies in excess <br />of 3/16 inch [5 mm] in accordance with 330-12.5.1, and retest the corrected areas prior <br />to placing the friction course. <br />For bicycle paths, straightedge the final structural layer with a <br />rolling straightedge, either behind the final roller of the paving train or as a separate <br />operation. Correct all deficiencies in excess of 5/16 inch [8 mm] in accordance with 330- <br />12.5.1. Retest all corrected areas. If the Engineer determines that the deficiencies on the <br />bicycle path are due to field geometrical conditions, the Engineer will waive corrections <br />with no deduction to the pay item quantity. <br />330-12.4.5.5 Friction Course Layer: Acceptance for pavement <br />smoothness will be based on verified Quality Control measurements using the rolling <br />straightedge. The Engineer will verify the straightedge testing by observing the Quality <br />Control straightedging operations. <br />At the completion of all paving operations, straightedge the <br />friction course as a separate operation. As an exception, if approved by the Engineer, <br />straightedge the friction course behind the final roller of the paving train. Correct all <br />deficiencies in excess of 3/16 inch [5 mm] in accordance with 330-12.5.1. Retest all <br />corrected areas. <br />330-12.5 Correcting Unacceptable Pavement: <br />330-12.5.1 General: Correct all areas of unacceptable pavement at no <br />cost to the Department. <br />330-12.5.1.1 Structural Layers: Correct deficiencies in the Type SP <br />structural layer by one of the following methods: <br />a. Remove and replace the full depth of the layer, extending a <br />minimum of 50 feet [15 m] on either side of the defective area for the full width of the <br />paving lane. <br />b. Mill the pavement surface to a depth and width that is <br />adequate to remove the deficiency. (This option only applies if the structural layer is not <br />the final surface layer.) <br />330-12.5.1.2 Friction Course: Correct deficiencies in the friction <br />course layer by removing and replacing the full depth of the layer, extending a minimum of <br />50 feet [15m] on either side of the defective area for the full width of the paving lane. <br />Corrections may be waived if approved by the Engineer, and an adjustment to the pay item <br />quantity made as defined in 330-12.5.2. <br />330-12.5.2 Reduction in Pay Item Quantity: When the Engineer elects to <br />waive corrections, the Department will reduce the pay quantity for the pay item in question <br />by the amount of material that the Contractor would have removed and replaced had the <br />correction been made. When the pay quantity is in tons [metric tons], the Department will <br /> <br />. <br /> <br />,., <br />. <br /> <br />" <br />. <br /> <br />" <br />. <br /> <br />'1 <br />. <br /> <br />" <br />I <br />. <br /> <br />.., <br />. <br /> <br />I <br /> <br />"1 <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />1"'1 <br />. <br /> <br />'"" <br />. <br /> <br />.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />1"1 <br />. <br /> <br />. <br /> <br />.., <br /> <br />09/09 <br /> <br />01000-50 <br /> <br />03-4122.F <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.