My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.., <br /> <br />. <br /> <br />.., <br /> <br />The Engineer may waive the corrections specified above (at no <br />reduction in payment) if: <br />1) the deficiencies are sufficiently separated so as not to affect <br />the overall ride quality, traffic safety and surface drainage characteristics of the pavement <br />and; <br />2) the corrective action would unnecessarily mar the <br />appearance of the finished pavement. <br />For intersections, tapers, crossovers, transitions at beginning and end <br />of project and similar areas, adjust the cross slope to match the actual site conditions or as <br />directed by the Engineer. <br />330-12.4 Pavement Smoothness: Construct a smooth pavement meeting the <br />requirements of this Specification. <br />330-12.4.1 General: Furnish a 15 foot [4.572 m] manual and a 15 foot <br />[4.572 m] rolling straightedge meeting the requirements of FM 5-509. Make them available <br />at the job site at all times during paving operations. Obtain a smooth surface on all <br />pavement courses placed, and then straightedge all final structural and friction course <br />layers in accordance with 330-12.4.5. <br />330-12.4.2 Test Method: Perform all straightedge testing in accordance with <br />FM 5-509 with one pass of the rolling straightedge operated along the outside wheel path <br />of each lane being tested. The Engineer may require additional testing at other locations <br />within the lane. <br />330-12.4.3 Traffic Control: Provide traffic control in accordance with <br />Section 102 and the Design Standards Index Nos. 607 or 619 during all testing. When <br />traffic control cannot be provided in accordance with Index Nos. 607 or 619, submit an <br />alternative Traffic Control Plan as specified in 102-4. Include the cost of this traffic control <br />in the Contract bid prices for the asphalt items. <br />330-12.4.4 Process Control Testing: Assume full responsibility for <br />controlling all paving operations and processes such that the requirements of these <br />Specifications are met at all times. Address in the QC Plan the methods to be used to <br />control smoothness. <br />330-12.4.5 Quality Control Testing: <br />330-12.4.5.1 General: Straightedge the final Type SP structural layer <br />and friction course layer with a rolling straightedge. Test all pavement lanes and ramps <br />where the width is constant using a rolling straightedge and document all deficiencies on a <br />form approved by the Engineer. Notify the Engineer of the location and time of all <br />straightedge testing a minimum of 48 hours before beginning testing. <br />330-12.4.5.2 Rolling Straightedge Exceptions: Testing with the rolling <br />straightedge will not be required in the following areas: intersections, tapers, crossovers, <br />parking lots and similar areas. In addition, testing with the rolling straightedge will not be <br />performed on the following areas when they are less than 50 feet [15 m] in length: turn <br />lanes, acceleration/deceleration lanes and side streets. However, correct any individual <br />surface irregularity in these areas that deviates from the plan grade in excess of 3/8 inch <br />[10 mm] as determined by a 15 foot [4.572 m] manual straightedge, and that the Engineer <br />deems to be objectionable, in accordance with 330-12.5.1. <br />In addition, the Engineer may also waive the straightedging <br />requirements on ramps and superelevated sections where the geometrical orientation of the <br />pavement results in an inaccurate measurement with the rolling straightedge. <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />-, <br />. <br /> <br />r"'" <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />.., <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />,., <br />. <br /> <br />r'1 <br />. <br /> <br />,., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />-, <br />. <br /> <br />-, <br />. <br /> <br />.., <br />. <br /> <br />.., <br /> <br />. <br /> <br />,.... <br /> <br />. <br /> <br />09/09 <br /> <br />01 000-49 <br /> <br />03-4122.F <br /> <br />,.., <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.