My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.., <br /> <br />. <br /> <br />r""I <br /> <br />. <br /> <br />337-6 Acceptance of the Mixture. <br />337-6.1 FC-9.5 and FC-12.5: Meet the requirements of 334-5. <br />337-6.2 FC-5: Meet the requirements of 334-5 with the following exceptions: <br />1. The mixture will be accepted with respect to gradation (P-3/S, P-4, and P-s), <br />and asphalt binder content (Pb) only. <br />2. Testing in accordance with AASHTO T312-04 and FM 1-T 209 (and <br />conditioning prior to testing) will not be required as part of 334-5.1.1. <br />3. The standard LOT size of FC-5 will be 2,000 tons [2,000 metric tons], <br />with each LOT subdivided into four equal sublots of 500 tons [500 metric tons] each. <br />4. Initial production requirements of 334-5.3 do not apply. <br />5. The Between-Laboratory Precision Values described in Table 334-5 are <br />modified to include (P-3/S, P-4, and P-s) with a maximum difference per FM 1-T 030 <br />(Figure 2). <br />6. Table 334-4 (Master Production Range) is replaced by Table 337-2. <br />7. The mixture will be accepted on the roadway with respect to surface <br />tolerance in accordance with the applicable requirements of 334-5.8. No density testing <br />will be required for these mixtures. <br /> <br />r"J <br />. <br /> <br />r'l <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />I' <br /> <br />Table 337-2 <br />FC-5 Master Production Range <br />Characteristic Tolerance (1 ) <br />Asphalt Binder Content (%) Target :t 0.60 <br />Passing 3/8 inch [9.50 mm] Sieve (%) Target :t 7.50 <br />Passing No.4 [4.75 mm] Sieve (%) Target :t 6.00 <br />Passing No.8 [2.36 mm] Sieve (%) Target :t 3.50 <br />(1) Tolerances for sample size of n = 1 from the verified mix design <br /> <br />. <br /> <br />, <br />. <br /> <br />,., <br />. <br /> <br />.., <br />. <br /> <br />II <br /> <br />337-6.2.1 Individual Test Tolerances for FC-5 Production: In the event that <br />an individual Quality Control test result of a sublot for gradation (P-3/S, P-4, and P-s), does <br />not meet the requirements of Table 337-2, take steps to correct the situation and report <br />them to the Engineer. <br />In the event that two consecutive individual Quality Control test <br />results for gradation (P-3/S, P-4, and P-s) or an individual test result for asphalt binder content <br />does not meet the requirements of Table 337-2, the LOT will be automatically terminated <br />and production of the mixture stopped until the problem is adequately resolved (to the <br />satisfaction of the Engineer), unless it can be demonstrated to the satisfaction of the <br />Engineer that the problem can immediately be (or already has been) resolved. Address any <br />material represented by the failing test result in accordance with 334-5.9.5. <br /> <br />. <br /> <br />-, <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />,., <br /> <br />. <br /> <br />337-7 Special Construction Requirements. <br />337-7.1 Hot Storage of FC-5 Mixtures: When using surge or storage bins in the <br />normal production of FC-5, do not leave the mixture in the surge or storage bin for more <br />than one hour. <br />337 -7.2 Longitudinal Grade Controls for Open-Graded Friction Courses: On FC-5, <br />use either longitudinal grade control (skid, ski or traveling stringline) or a joint matcher. <br />337-7.3 Temperature Requirements for FC-5: <br />337-7.3.1 Air Temperature at Laydown: Spread the mixture only when the <br /> <br />r"'l <br />. <br /> <br />.., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />09/09 <br /> <br />01000-75 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.