<br />M <br /> <br />. <br /> <br />n <br />. <br /> <br />102-5.5 Access for Residences and Businesses: Provide continuous access to all <br />residences and all places of business. <br />102-5.6 Protection of the Work from Injury by Traffic: Where traffic would be <br />injurious to a base, surface course, or structure constructed as a part of the work, maintain <br />all traffic outside the limits of such areas until the potential for injury no longer exists. <br />102-5.7 Flagger: Provide trained flaggers in accordance with Section 105. <br />102-5.8 Conflicting Pavement Markings: Where the lane use or where normal <br />vehicle paths are altered during construction, remove all pavement markings (paint, tape, <br />thermoplastic, raised pavement markers, etc.) that will conflict with the adjusted vehicle <br />paths. Use of paint to cover conflicting pavement markings is prohibited. Remove <br />conflicting pavement markings using a method that will not damage the surface texture of <br />the pavement and which will eliminate the previous marking pattern regardless of weather <br />and light conditions. <br />Remove all pavement markings that will be in conflict with "next phase of <br />operation" vehicle paths as described above, before opening to traffic. <br />Cost for removing conflicting pavement markings (paint, tape, thermoplastic, <br />raised pavement markers, etc.) to be included in Maintenance of Traffic, Lump Sum. <br />102-5.9 No Waiver of Liability: Conduct operations in such a manner that no undue <br />hazard results due to the requirements of this Article. The procedures and policies <br />described herein in no way acts as a waiver of any terms of the liability of the Contractor <br />or his surety. <br /> <br />r"1 <br />. <br /> <br />n <br />. <br /> <br />n <br /> <br />. <br /> <br />,., <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />102-6 Detours. <br />102-6.1 General: Construct and maintain detour facilities wherever it becomes <br />necessary to divert traffic from any existing roadway or bridge, or wherever construction <br />operations block the flow of traffic. <br />102-6.2 Construction: Plan, construct, and maintain detours for the safe passage of <br />traffic in all conditions of weather. Provide the detour with all facilities necessary to meet <br />this requirement. <br />Where the plans call for the Department to furnish detour bridge <br />components, construct the pile bents in accordance with the plans, unless otherwise <br />authorized by the Engineer. <br />Submit a letter with the following: company name, phone number, office <br />address, project contact person, project number, detour bridge type, bridge length, span <br />length, location and usage time frames, to the Engineer at least 30 calendar days before <br />the intended pick-up date, to obtain the storage facility location and list of components for <br />the project. Upon receipt of letter, the Engineer will, within ten calendar days provide an <br />approved material list to the Contractor and the appropriate Department storage yard. <br />Provide a letter with an original company seal, identifying the representative <br />with authority to pick up components, to the Engineer at least ten calendar days before the <br />proposed pick-up date. The Department is not obligated to load the bridge components <br />without this notice. Take responsibility and sign for each item loaded at the time of <br />Issuance. <br /> <br />n <br />. <br /> <br />1"1 <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />I <br /> <br />" <br />. <br /> <br />~ <br />. <br /> <br />~ <br />. <br /> <br />Provide timber dunnage, and transport the bridge components from the <br />designated storage facility to the job site. Unload, erect, and maintain the bridge, then <br />dismantle the bridge and load and return the components to the designated storage facility. <br />Notify the Engineer in writing at least ten calendar days before returning the <br />components. Include in this notice the name of the Contractor's representative authorized <br /> <br />n <br /> <br />. <br /> <br />,., <br /> <br />09/09 <br /> <br />01000-4 <br /> <br />03-4122.F <br /> <br />. <br />