Laserfiche WebLink
<br />...... <br /> <br />. <br /> <br />..., <br />. <br /> <br />., <br />. <br /> <br />.., <br />. <br /> <br />1'"1 <br />. <br /> <br />I <br /> <br />1'"1 <br />. <br /> <br />n <br />. <br /> <br />r"1 <br />. <br /> <br />n <br />. <br /> <br />i1 <br />. <br /> <br />n <br />. <br /> <br />I <br /> <br />n <br />. <br /> <br />.., <br />. <br /> <br />r"l <br />. <br /> <br />,., <br /> <br />. <br /> <br />..., <br />. <br /> <br />.., <br />. <br /> <br />to sign for return of the bridge components. The yard supervisor is not obligated to unload <br />the bridge components without this notice. <br />The Department will provide equipment and an operator at the Department's <br />storage facility to assist in loading and unloading the bridge components. Furnish all other <br />labor and equipment required for loading and unloading the components. <br />The Departments representative will record all bridge components issued or <br />returned on the Detour Bridge Issue and Credit Ticket. The Tickets must be signed by a <br />Department and Contractor representative, after loading or unloading each truck to <br />document the quantity and type of bridging issued or returned. <br />Bind together all bridge components to be returned in accordance with the <br />instructions given by the storage facility. The yard supervisor will repack components that <br />are not packed in compliance with these instructions. Upon request, written packing <br />instructions will be made available to the Contractor, before dismantling of the bridge for <br />return to the Department's storage facility. <br />Assume responsibility for any shortage or damage to the bridge components. <br />Monies due the Contractor will be reduced at the rate of $35.00 per hour plus materials for <br />repacking, repairs or replacement of bridge components. <br />The skid resistance of open steel grid decking on the detour bridge may <br />decrease gradually after opening the bridge to traffic. The Department will furnish a <br />pneumatic floor scabbier machine for roughening the roadway surface of the detour bridge <br />decking. Provide an air compressor at the job site with 200 ft3/minute [6 m3/minute] <br />capacity, 90 psi [620 kPa] air pressure for the power supply of the machine, and an <br />operator. Transport the scabbier machine to and from the Department's Structures Shop. <br />Repair any damage to the scabbier machine caused by operations at no expense to the <br />Department. Perform scabbling when determined necessary by the Engineer. The <br />Department will pay for the cost of scabbling as Unforeseeable Work in accordance with <br />4-4. <br />Return the bridge components to the designated storage facility beginning no <br />later than ten calendar days after the date the detour bridge is no longer needed, the date <br />the new bridge is placed in service, or the date Contract Time expires, whichever is <br />earliest. Return the detour bridging at an average of not less than 200 feet [61 m] per <br />week. Upon failure to return the bridge components to the Department within the time <br />specified, compensate the Department for the bridge components not returned at the rate <br />of $5.00 per 10 feet [$1.65 per meter], per day, per bridge, for single lane; and $10.00 <br />per 10 feet [$3.30 per meter], per day, per bridge, for dual lane until the bridge <br />components are returned to the Department. <br />102-6.3 Construction Methods: Select and use construction methods and materials <br />that provide a stable and safe detour facility. Construct the detour facility to have <br />sufficient durability to remain in good condition, supplemented by maintenance, for the <br />entire period that the detour is required. <br />102-6.4 Removal of Detours: Remove detours when they are no longer needed and <br />before the Contract is completed. Take ownership of all materials from the detour and <br />dispose of them, except for materials, which might be on loan from the Department with <br />the stipulation that they are returned. <br />102-6.5 Detours Over Existing Roads and Streets: When the Department specifies <br />that traffic be detoured over roads or streets outside the project area, do not maintain such <br />roads or streets. However, maintain all signs and other devices placed for the purpose of <br />the detour. <br /> <br />09/09 <br /> <br />01000-5 <br /> <br />03-4122.F <br />