Laserfiche WebLink
<br />.., <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.-, <br />. <br /> <br />,., <br />. <br /> <br />Ij <br />. <br /> <br />..., <br />. <br /> <br />r-, <br /> <br />. <br /> <br />.., <br />I <br /> <br />.., <br />. <br /> <br />,.., <br /> <br />. <br /> <br />., <br /> <br />. <br /> <br />I 1 <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />,., <br />. <br /> <br />-, <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />,., <br />. <br /> <br />..... <br /> <br />. <br /> <br />...... <br /> <br />- <br /> <br />Subsequent to the laboratory trial batch, perform a field <br />demonstration of the proposed mix design by production and placement of at least three <br />batches, 3 yd3 [2.3 m3] minimum size each, of concrete containing flowing concrete HRWR <br />admixture. Take representative samples from each batch and perform slump, air content, <br />density (unit weight), and temperature tests on these samples. Cast specimens from each <br />sample for compressive strength tests. Record the ambient air temperature during the test. <br />Ensure that the concrete properties are within the required specification limits. The plants <br />that are producing concrete with batch sizes of less than 3 yd3 [2.3 m3] are required to <br />produce and place at least a total amount of 9 yd3 [6.9 m3] and perform the <br />aforementioned tests on at least three randomly selected batches. <br />Determine the workability of the demonstration concrete <br />batches by performing the slump tests on the samples taken at 15 minute intervals from <br />each batch. Continue sampling and testing until the slump measures 6 inches [150 mm] or <br />less. From the plot of slump versus time, determine the time for each batch when the <br />slump is at 7.5 inches [190 mm]. The shortest time period determined from three <br />consecutive batches, at 7.5 inches [190 mm] slump, is considered the cutoff time of the <br />proposed concrete mix. For production concrete, ensure that the time between the <br />batching and depositing of each load of concrete is less than the cutoff time of the mix <br />and also does not exceed the allowable time limit specified in 346-7.6. <br />Ensure that the demonstration concrete is mixed, delivered, <br />placed, consolidated and cured in accordance with the proposed method and sequence. <br />Produce the flowing concrete batches at slumps between 7.5 inches to 10.5 inches [190 <br />mm to 265 mm]. <br />Perform inspection of the demonstration concrete during <br />batching, delivery, placement and post placement. During placement, ensure that the <br />concrete batches meet all plastic property requirements of the specifications and maintain <br />their cohesive nature without excessive bleeding, segregation, or abnormal retardation. <br />Dispose of concrete produced for demonstration purposes at <br />no expense to the Department. Subject to the Engineer's approval, the Contractor may <br />incorporate this concrete into non-reinforced concrete items and may be included for <br />payment, provided it meets Contract requirements for slump, entrained air, and strength. <br />After removal of the forms, perform the post-placement <br />inspection of the in-place concrete. Observe for any signs of honeycombs, cracks, <br />aggregate segregation or any other surface defects and ensure that the hardened concrete <br />is free from these deficiencies. The Engineer may require saw cutting of the mock-up <br />products to verify the uniform distribution of the aggregates within the saw cut surfaces <br />and around the reinforcing steel and prestressing strands. The Engineer will require saw <br />cutting of the demonstration mock-up products for plants that are demonstrating the use <br />of the flowing concrete for the first time. Obtain core samples from different locations of <br />mock-up products to inspect the aggregate distribution in each sample and compare it with <br />the aggregate distribution of other core samples. Perform rapid chloride permeability or <br />surface resistivity tests on the core samples or test cylinders. <br />Submit the results of the laboratory trial batch tests and field <br />demonstration of verified test data and inspection reports to the Engineer, along with <br />certification stating that the results of the laboratory trial batch tests and field <br />demonstration tests indicate that the proposed concrete mix design meets the <br />requirements of the specifications. For the proposed mix design, state the anticipated <br /> <br />09/09 <br /> <br />01000-91 <br /> <br />03-4122.F <br />