My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 3:03:37 PM
Creation date
5/12/2011 2:59:31 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design & Build Svcs. for Skateboard Park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />safely from one area to another. The design layout shall also conform to industry standards <br />for spacing and placement of components. <br /> <br />Materials shall be high quality, free from all defects, low-maintenance, designed for <br />durability, and tamper/vandal resistant. The skateboard park shall be constructed with <br />concrete. The successful proposer is responsible for rectifying any of the grounds/foundation <br />or facilities that are damaged during construction by its employees or subcontractors. The <br />successful proposer is responsible for securing all necessary permits prior to construction and <br />for securing the area during construction in order to meet the City's construction site <br />standards under the City Code. Site cleanup after each day during construction and <br />installation is mandatory. Appropriate signage shall be installed by the successful proposer <br />to restrict use of the skateboard park area until the date the City officially opens the <br />skateboard park area for use. <br /> <br />The successful proposer shall provide maintenance guidelines and inspection checklists upon <br />completion of installation and shall provide on-site training for the City staff. The City will <br />make payment for all work and equipment only after final approval of the facility's <br />acceptability. All paperwork, including but not limited to brochures, instruction manuals, <br />specifications, blueprints, and operations manuals, shall be provided to the City before final <br />payment is made. Prior to beginning work, the successful proposer shall submit to the City <br />final equipment specifications including drawings, equipment layout and locations, etc., for <br />final approval. All equipment and installation must meet all applicable federal, state and <br />local codes and laws. <br /> <br />1.4 SCOPE OF SERVICES AND CONSTRUCTION BUDGET <br /> <br />The City is soliciting professional design and build services for the construction of a <br />skateboard park at Town Center Park, a 3 acre park located on the west side of Collins <br />Avenue and 172nd Street in the City of Sunny Isles Beach, Florida. The scope of services <br />will also include the professional design and construction of the path from Collins Avenue on <br />the north side of Town Center Park and the redesign of the entrance area from the <br />southeastern area of Town Center Park. Demonstrative pictures of the Town Center Park <br />area are attached hereto as Attachment "A". <br /> <br />This site is located near an environmentally sensitive area, i.e. mangroves. An adequate <br />buffer is necessary between the skateboard park area and the environmentally sensitive <br />mangrove area and neighboring condominiums. <br /> <br />The successful design and build team will include, but not be limited to, the following tasks: <br /> <br />. Facility location and planning <br />. Environmental considerations <br />. Landscape coordination <br />. Specialized construction for a skateboard park <br />. Possible public involvement <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.