Laserfiche WebLink
<br />The City contemplates the design and build team will include (but not be limited to) the <br />following minimum disciplines: <br /> <br />. Environmental design specialists <br />. Landscape professionals <br />. Park development specialists <br /> <br />The intent is to have the design and build team provide a viable holistic approach to the <br />construction of the skateboard park. The final product must be economically feasible, it must <br />be aesthetically pleasing and it must be compatible with the environmentally sensitive <br />mangrove area and neighboring condominiums. The estimated design and construction <br />budget is $250,000.00 (two hundred and fifty thousand dollars). <br /> <br />1.5 SUBMITT AL REQUIREMENTS <br /> <br />Proposals shall be as thorough and detailed as possible so that the City may properly evaluate <br />the capabilities of respective firms to provide the required services. All submittals by <br />Proposers shall contain no more than fifteen (15) pages specifically addressing the following <br />issues. All other required documentation (except for 11 and 12 below) will not be considered <br />a part of the fifteen (15) pages. <br /> <br />Any Proposer wishing to provide the services described in Sections 1.1 through 1.4 above <br />must submit one (1) original and four (4) additional complete copies that include, at a <br />minimum, the following documentation: <br /> <br />1. Name, address and company, including, but not limited to, a business overView, <br />financial state of the business, annual revenue for past two years, and names and <br />addresses of persons having financial interest in the firm. <br /> <br />2. Provide a narrative description of current and previous experience for the past five (5) <br />years in design and build services for a skateboard park, as well as a corresponding <br />list of client references with contact names and telephone numbers. <br /> <br />3. Provide a detailed cost proposal which shall include all costs associated with the <br />design and construction of the proposed skateboard park located at Town Center <br />Park. <br /> <br />4. Provide a specific task oriented timeline for the design and construction of the <br />skateboard park. <br /> <br />5. Proof of authorization to transact business in Florida from the Florida Secretary of <br />State, from the prime as well as any supporting firm(s). <br /> <br />6. The name, title, qualifications, experience, and all contact information of the <br />proposed contact person. <br /> <br />7. A listing of the proposed personnel to be assigned to this project, including their <br />qualifications, professional licensure and experience. <br /> <br />5 <br />