Laserfiche WebLink
<br />skatepark at the Lakemont Community Center and a 12,000 sq ft skate plaza located at the Highlands Community <br />Center. The Lakemont site was a small sliver of land at the edge of a detention pond and pedestrian walking trail <br />requiring careful design to create a skatepark that integrated with the existing topography. During construction <br />limited access and its location along a walking path that was to remain open throughout construction made <br />proper sequencing of material deliveries and concrete pours crucial for a successful completion. <br /> <br /> <br /> <br />i <br /> <br />Project Name: Kiwanis Skatepark Budget: Design $12,500 Construction $332,500 <br />Location: Yakima, WA Size: 11,000 sq ft Project Manager: Matt Fluegge <br />Dates: Design 6/05 - 12/05 Construction 6/07 - 4/08 Lead Designer: Matt Fluegge <br />Reference: Bruce Floyd, Construction Supervisor, City of Yakima (509) 728 34570 <br /> <br />Project Summary: This project includes a 5,000 sq ft bowl with a 6,000 sq ft street course. Grindline served <br />as Designer and the Prime Contractor on this project. The construction site was located in an existing park, <br />nestled between many mature, existing trees. Grindline incorporated the trees into the design creating skateable <br />paths that went around the trees. This helped integrate the skatepark into it's surroundings and also gives the <br />space a more open feel while skating the park. Problems securing the owners targeted construction budget <br />delayed construction until summer of 2008. Grindline made use of it's in-house design staff and came up with an <br />updated design that fit into the original bid, while offering exciting new features and techniques developed during <br />the years that passed between design and construction. The result was an updated design with no added costs <br />to the owner. <br /> <br /> <br />Project Name: Lee and Joe Jamail Skatepark <br />Location: Houston, TX <br />Dates: Design 12/05 - 6/06 Construction 6/07 - 4/08 <br />Size: 35,000 sq ft Budget: $1 ,900,000 <br /> <br />Reference: Barry Blumenthal, Director <br />Public Use Skateparks Houston (PUSH) <br />(281) 658-4762 <br /> <br />Project Summary: Grindline was exclusively selected to design and construct Houston's new public skatepark <br />because of our extensive experience and reputation amongst skateboarders and past clients. Featuring 3 bowls <br />and a large flowing street course, this 35,000 sq ft skatepark is one of the largest skateparks in the nation. The <br />Owner's goal for this project was a design for the premier skatepark in the United States, a facility that would <br />attract skaters from across the globe.We met the challenge of integrating this skatepark into an environmentally <br />3 <br />