<br />sensitive 10cation.The site is located in a former bayou and has a highly fluctuating water table level.The drainage <br />system is designed to use the bowls as detention to prevent build up of hydrostatic pressure under the park in <br />the event of a major storm.This system was put to the test in September 2008 when Hurricane Ike hit Houston. <br />The drainage system functioned as designed and the skatepark was back in operation in less than a week after <br />the storm. <br /> <br /> <br />To kick the project off Grindline met with Clark Condon (who was the prime design firm on this project), PUSH, <br />and the rest of the design team to identify the specific goals, budget and schedule for this project. The result of <br />this meeting was documented design criteria supported by all participants which formed the direction and basis <br />of the preliminary design. Collaborating with all members of the design team, and based on the criteria set forth <br />from the kick off meeting, Grindline developed preliminary concepts to present to back to the team as well as <br />the community. During the preliminary design, meetings were held with the city project manager and the design <br />team to verify progress, facilitate communication, and pro actively address any conflicts or concerns. During final <br />design development, the city manager decided that the skatepark needed to be reduced about 25% in size due <br />to budget constraints for construction. Grindline accomplished this under severe time restrictions while still <br />maintaining the project goals. Later, the utilities review determined that no substantial skate elements could be <br />built over an 18" pipe that ran through the site from the reservoir next door. Again, the design was modified to <br />include green space and shade structures and form a natural separator between the street area and the larger <br />advanced bowls. Once the City had completed their design reviews, the construction documents were drafted <br />by our in house drafting team for comments and revisions. The final permit set was delivered to the Building <br />Department and the project was given the green light for construction. The project was completed on time and <br />within budget. Over 45,000 skateboarders have entered this park since opening in June 2008. <br /> <br />Other References: <br /> <br />Bonnie Pendergrass <br />Project Manager, Seattle Center <br />City of Seattle,WA <br />(206) 615-1806 <br /> <br />Gary Keck <br />Senior Planner <br />Tualatin Hills Park and Rec. Dept. <br />(503) 645-6433 <br /> <br />Rod Tweet <br />Asst. Director of Parks and Rec. <br />City of Amarillo, TX <br />(806) 378-3037 <br /> <br />Sam Adams <br />Public Works Director <br />City of Battleground, WA <br />(360) 342-5000 <br /> <br />Kim Conrad <br />Parks and Rec. Director <br />City of Grove City. OH <br />(614) 227-3050 <br /> <br />Erinn McKenna <br />Senior Planner <br />City of Stamford, CT <br />2039774715 <br /> <br />Timmy Johnson <br />Director <br />City of Atlantic Beach. FL <br />(904) 247-5828 <br /> <br />David Zellar <br />Parks Director <br />City of Forks,WA <br />(360) 374-5412 <br /> <br />Tad Fujioka <br />City Engineer, <br />City of Sitka,AK <br />(907) 747-1858 <br /> <br />4 <br />