My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(11-04-03) Stormwater Catch Basin Cleaning
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2011 10:23:52 AM
Creation date
5/26/2011 10:21:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Storm water Catch Basin Cleaning
Bid No. (xx-xx-xx)
11-04-03
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o Employers' Non-Ownership. <br /> <br />Before starting the Work, the bidder will file and make sure that all certificates of <br />insurance required by this document and by the Contract are in the City's possession. <br />These certificates shall contain a provision that the coverage afforded under the policies <br />will not be canceled or materially changed until at least thirty (30) days prior written <br />notice has been given to the City by certified mail. The City shall be named as an <br />additional insured on the above-referenced policies. <br /> <br />The bidder agrees that if any part of the Work under the Contract is sublet, they will <br />require the Sub-bidder(s) to carry insurance as required, and that they will require the <br />Sub- bidder(s) to furnish to them insurance certificates similar to those required by the <br />City in this section. <br /> <br />2.9.1 Cancellation and Re-Insurance: <br /> <br />If any insurance should be canceled or changed by the insurance company or should any <br />insurance expire during the period of this contract, the Contractor shall be responsible for <br />securing other acceptable insurance to provide the coverage specified in this section to <br />maintain coverage during the life of this Contract. All deductibles must be declared by <br />the Contractor and must be approved by the City. At the option of the City, either the <br />Contractor shall eliminate or reduce such deductible or the Contractor shall procure a <br />Bond, in a form satisfactory to the City, covering the same. <br /> <br />2.10 MONTHLY INVOICES PAYMENTS <br /> <br />Cut-off date is the close of the last business day of the month. Bidder shall submit by the 10th <br />day of the following month bidder's completed Statement of Services/Invoice. Should the 10th <br />fall on a weekend or holiday, Contractor shall submit his application on the next workday. <br /> <br />Bidder is advised that processing of invoices must follow this schedule, as the City has funding <br />requirements and other payment obligations which may prevent payment of late Statement of <br />Services for that month's billing cycle. A late Statement of Services with a recommendation for <br />payment will be paid in the next month's billing cycle. <br /> <br />2.11 ACCEPTANCE OF PRODUCT BY THE CITY <br /> <br />The product(s) to be provided hereunder shall be delivered to the City, and maintained if <br />applicable to the contract, in full compliance with the specifications and requirements set forth in <br />this contract. If a bidder-provided product is determined to not meet the specifications and <br />requirements of this contract, either prior to acceptance or upon initial inspection, the item will <br />be returned, at bidder expense, to the bidder. At the City's own option, the bidder shall either <br />provide a direct replacement for the item, or provide a full credit for the returned item. The <br />bidder shall not assess any additional charge(s) for any conforming action taken by the City <br />under this clause. <br /> <br />2.12 CLEAN-UP <br /> <br /> <br />All unusable materials and debris shall be removed from the premises _ <br />. Upon final complet~ <br />~~ all areas where wO~.has been involved as mutually agreed with the <br /> <br />PAGE 18 OF 28 <br />BID No. 11-01-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.