<br />3.2.17. EMERGENCIES
<br />
<br />3.2.17.1
<br />
<br />crated, shall remain crated until ready for installation. Lawns, grass plots
<br />or other private property shall not be used for storage purposes without
<br />written permission of City or lessee unless otherwise within terms of the
<br />easements obtained by the City.
<br />
<br />The Contractor shall give notice in writing at least 48 hours before
<br />breaking ground, to all persons, Public Utility Companies, public
<br />agencies, government agencies owners of property having structures or
<br />improvements in proximity to site of the Work, superintendents,
<br />inspectors, or those otherwise in charge of property, streets, water pipes,
<br />gas pipes, sewer pipes, telephone cables, electric cables, railroads or
<br />otherwise, who may be affected by the Contractor's operation, in order
<br />that they may remove any obstruction for which they are responsible and
<br />have representative on site to see that their property is properly
<br />protected.
<br />
<br />Contractor shall field locate all utilities and acknowledges that all utilities
<br />are not necessarily shown in the Contract Documents, or may be
<br />incorrectly located thereon. The Contractor shall protect all utilities
<br />encountered while performing its work, whether indicated on the Contract
<br />Drawings or not. The Contractor shall maintain utilities in service until
<br />moved or abandoned. The Contractor shall exercise due care when
<br />excavating around utilities and shall restore any damaged utilities to the
<br />same condition or better as existed prior to starting the Work, at no cost
<br />to the City. The Contractor shall maintain operating utilities or other
<br />services, even if they are shown to be abandoned on the Contract
<br />Drawings, in service until new facilities are provided, tested and ready for
<br />use.
<br />
<br />The Contractor shall return all improvements on or about the site and
<br />adjacent property which are not shown to be altered, removed or
<br />otherwise changed to conditions which existed prior to starting work.
<br />
<br />The Contractor shall protect the Work, including but not limited to, the
<br />site, stored materials and equipment, excavations, and excavated or
<br />stockpiled soil or other material, intended for use in the Work, and shall
<br />take all necessary precautions to prevent or minimize damage to same
<br />or detrimental effect upon performance caused by or due to rain, snow,
<br />ice, run off, floods, temperature, wind, dust, sand and flying debris.
<br />
<br />The Contractor's superintendent shall take all steps reasonably
<br />necessary to prevent accidents and protect workers, material, equipment
<br />and property.
<br />
<br />The Contractor shall not load or permit any part of the Work to be loaded
<br />so as to endanger its safety.
<br />
<br />In any emergency affecting the safety of persons or property, the
<br />Contractor shall act to prevent threatened damage, injury or loss. The
<br />Contractor shall notify the City of the situation and all actions taken
<br />immediately thereafter. If, in the opinion of the Contractor, immediate
<br />action is not required, the Contractor shall notify the City of the
<br />