Laserfiche WebLink
<br />3.2.16.9 <br /> <br />3.2.16.10 <br /> <br />3.2.16.11 <br /> <br />3.2.16.12 <br /> <br />3.2.16.13 <br /> <br />3.2.16.14 <br /> <br />3.2.17. EMERGENCIES <br /> <br />3.2.17.1 <br /> <br />crated, shall remain crated until ready for installation. Lawns, grass plots <br />or other private property shall not be used for storage purposes without <br />written permission of City or lessee unless otherwise within terms of the <br />easements obtained by the City. <br /> <br />The Contractor shall give notice in writing at least 48 hours before <br />breaking ground, to all persons, Public Utility Companies, public <br />agencies, government agencies owners of property having structures or <br />improvements in proximity to site of the Work, superintendents, <br />inspectors, or those otherwise in charge of property, streets, water pipes, <br />gas pipes, sewer pipes, telephone cables, electric cables, railroads or <br />otherwise, who may be affected by the Contractor's operation, in order <br />that they may remove any obstruction for which they are responsible and <br />have representative on site to see that their property is properly <br />protected. <br /> <br />Contractor shall field locate all utilities and acknowledges that all utilities <br />are not necessarily shown in the Contract Documents, or may be <br />incorrectly located thereon. The Contractor shall protect all utilities <br />encountered while performing its work, whether indicated on the Contract <br />Drawings or not. The Contractor shall maintain utilities in service until <br />moved or abandoned. The Contractor shall exercise due care when <br />excavating around utilities and shall restore any damaged utilities to the <br />same condition or better as existed prior to starting the Work, at no cost <br />to the City. The Contractor shall maintain operating utilities or other <br />services, even if they are shown to be abandoned on the Contract <br />Drawings, in service until new facilities are provided, tested and ready for <br />use. <br /> <br />The Contractor shall return all improvements on or about the site and <br />adjacent property which are not shown to be altered, removed or <br />otherwise changed to conditions which existed prior to starting work. <br /> <br />The Contractor shall protect the Work, including but not limited to, the <br />site, stored materials and equipment, excavations, and excavated or <br />stockpiled soil or other material, intended for use in the Work, and shall <br />take all necessary precautions to prevent or minimize damage to same <br />or detrimental effect upon performance caused by or due to rain, snow, <br />ice, run off, floods, temperature, wind, dust, sand and flying debris. <br /> <br />The Contractor's superintendent shall take all steps reasonably <br />necessary to prevent accidents and protect workers, material, equipment <br />and property. <br /> <br />The Contractor shall not load or permit any part of the Work to be loaded <br />so as to endanger its safety. <br /> <br />In any emergency affecting the safety of persons or property, the <br />Contractor shall act to prevent threatened damage, injury or loss. The <br />Contractor shall notify the City of the situation and all actions taken <br />immediately thereafter. If, in the opinion of the Contractor, immediate <br />action is not required, the Contractor shall notify the City of the <br /> <br />12 <br />