My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A f J e-tJok( rI' <br />-0\ 1 <br /> <br />--- <br />Mandatory Pre-Proposal Conference Summary Minutes <br />Wednesday, July 20, 2011 at 2:30 p,m. <br /> <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />RFP No, 11-07-03, Professional Demolition Services for <br />Multiple City Properties <br /> <br />Gio Batista, Public Works Director/City Engineer, welcomed everyone. Staff present: Assistant City <br />Manager/Services Jorge Vera, City Clerk Jane A. Hines, Purchasing Agent Marc Tulloch, Assistant <br />City Attorney Fernando Amuchastegui, City Manager Alan 1. Cohen, and Administrative <br />Coordinator Luz Rey, City Clerk's Office. Public Works Director Gio Batista asked that everyone <br />be sure to sign in as this is a mandatory meeting, <br /> <br />The deadline for submission of Request for Proposals documents is Wednesday, August 10, 2011 <br />at 10:00 a.m., at which time those sealed responses will be publicly opened. Any additional <br />questions are required to be in writing and may be submitted up to five (5) days before the opening <br />(at the close of business, Friday, August 5, 2011), which will be answered and posted on <br />www.demandstar.com. You may email themtoCityClerkJaneA.Hinesatihines@sibfl.net. or fax <br />them to 305-792-1563. <br /> <br />Director Batista gave an overview of the project noting that this is for the demolition offive (5) City <br />properties, and noted the aerial map that was included in the documents with the location of those <br />properties. For the property at 350 Sunny Isles Boulevard we have a Lease Agreement with Miami- <br />Dade County Water and Sewer (W ASD), It is a Treatment Facility/Pump Station with a holding <br />tank and parking lot. The holding tank will be demolished and the entire lot, including the parking <br />lot, will be leveled to the ground. W ASD is bound to provide the drawings. The Proposer shall <br />meet with and provide W ASD with all necessary documents and tests that the agency requires for <br />the demolition of the existing holding tank. This is more than a demolition project, and we will <br />provide all information needed to accomplish the demolition. Whatever W ASD wants, we do, and <br />whatever we do must be approved by W ASD. <br /> <br />Director Batista opened the meeting to questions from the prospective bidders. <br /> <br />QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS <br /> <br />I. What is the extent of demolition, what point is existing lines? <br />FOI' all properties it shall be as per the RFP. As to the W ASD property, demolition of <br />property up to wet well as per W ASD and parking lot al'e to the west of the tank. <br />Demolish tank to grade and remove all aspects of the pal'king and the tank as allowed <br />by WASD. (See attached Lease Agreement for additional information on approvals) <br /> <br />2. What are your expectations, the entire holding tank, may be 15 feet below ground? <br />Level the sudace, elevation 0, above ground to grade. Remove the tank entirely and <br />replace with suitable fill up to gradc. Verify tank information with \V ASD to cnsure <br />that thc entire scope is understood. <br /> <br />11-07-03 Pre-Submittal Conference Q/\ 072011.<1oc <br /> <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.