My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. What will this property be used for? <br />It will be a City Park, and so no structures, <br /> <br />. 4. As Built Plans for W ASD? <br />As to the W ASD property, the City has no as-built plans. We will put the contact <br />person for W ASD on DemandStar. Vendor will be responsible to pl'ovide all necessal")' <br />documentation, including a scaled set of demolition plans with sufficient information to <br />comply with all agencies having jurisdiction. Vendor shall include ALL elements of <br />demolition and permitting for all necessary ,york. <br /> <br />5. All properties together? <br />It is a five-part proposal on a per location basis. One part, and it is listed in the RFP, is <br />going to begin sooner than the rest. Just note to use the dates that arc in the RFP as <br />your approximate Notice to Proceed. <br /> <br />6. Are you going to award these separately? <br />The presumption is that we will get a better deal if we do them all together. We will not <br />be sepal'ating these in pieces, we will be awarding to one particular vendor. HO'\H~ver, <br />the City may award separate contracts for each site. <br /> <br />7. Is the tank empty? <br />Please ve!"ify with W ASD. <br /> <br />8. Was it a water tank? <br />Not sure, please verify with W ASD. On the W ASD site, we need to be clear that the <br />proposal should include the entire extent of what could be expected or anticipated in a <br />similal' pl"Oject. <br /> <br />9. Will there be a check list of what WASD will require? <br />No. If you don't have experience with W ASD, you will soon find out with WASD that it <br />is a lot of back and forth. There is nothing in w!"iting in the form of a check list that <br />would allow you to undel'stand exactly the extent of what they llre going to require. <br /> <br />10. Is there a contact person? <br />We will provide a contact person for W ASD as an Addendum or Clarification on <br />DemandStar. They arc aware of it, the extent is what you arc going to have to figure <br />out in the proposal. <br /> <br />11. What are the other facilities? <br />The other four facilities al'e pretty straight fonvard since they al'e City-owned <br />propel'ties. Scope shall be per the RFP which includes demolition of all above ground <br />structu I'es, trees, and others to grade. Properties shall be su rvcycd by the V cndor with <br />necessal'y clcmcnts to obtain a pcrmit from all agcncies having jurisdiction. <br /> <br />12. Are you asking for an asbestos surveyor a boundary survey? <br />Both. <br /> <br />11-07-03 Pre-Submittal Conference QA 072011.uoc <br /> <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.