My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br /> <br />25221 Wesley Chapel Blvd, <br />Lutz, Florida 33559 <br />Phone: (813) 907-1013' Fax: (813) 907-0297 <br /> <br />TECHNICAL PLAN FOR GENERAL DEMOLITION <br /> <br />OUR TECHNICAL PLAN IS PREDICATED ON PROVIDING DEMOLmON SERVICES TO OUR <br />CLIENTS IN THE SAFEST AND MOST COST EFFECTIVE METHOD POSSIBLE. THE MOST <br />IMPORT ANT GOAL OF OUR PLAN IS TO MINIMIZE THE RISK OF INJURY AND PROPERTY <br />DAMAGE WHILE EXECUTING THE WORK IN AN EFFICIENT MANNER THE BEST WAY TO <br />ACHIEVE THESE GOALS IS TO APPROACH EACH PROJECT WITH A POSITIVE A TIITUDE <br />AND TO IMPLEMENT A TEAM APPROACH TO COMPLETING THE WORK. THE SUCCESSFUL <br />TEAM CONSISTS OF THE FOLLOWING ELEMENTS: <br /> <br />(1) PRINCIPLE IN CHARGE <br />(2) OFFICE MANAGER AND STAFF <br />(3) PROJECT MANAGER <br />(4) PROJECT SUPERINTENDENT <br />(5) EXPERIENCED AND WELL TRAINED WORKFORCE <br /> <br />THE PRIMARY RESPONSffiILITIES OF THE PRINCIPLE IN CHARGE ARE: <br /> <br />c <br /> <br />(A) PROVIDE RESPONSIBLE AND EXPERIENCED EMPLOYEES <br />(B) MAKE SURE TIIA T ALL TEAM MEMBERS HAVE EVERYTIIING THEY NEED TO ACHIEVE <br />THE GOALS OF THE COMPANY <br />(C) ASSIGN RESPONSIBILITY AT ALL LEVELS <br />(D) PROVIDE TOP QUALITY EQUIPMENT AS NECESSARY TO SUCCESSFULLY COMPLETE <br />ALL OF THE WORK <br />(E) MAKE SURE TIIA T ALL FACETS OF THE PARTICULAR JOB ARE CLEARLY UNDERSTOOD <br />BY ALL RESPONSIBLE PERSONS <br />(F) OVERSEE ALL ACTIVITIES ON A CONTINUAL BASIS TO MAKE SURE THAT ALL WORK <br />IS PROCEEDING SAFELY AND CORRECTLY AND TIIAT ALL GOALS OF THE COMPANY <br />ARE BEING ACHIEVED <br /> <br />THE RESPONSffiILITIES OF THE PROJECT MANAGER INCLUDE BUT ARE NOT LIMITED <br />TO THE FOLLOWING: <br /> <br />c <br /> <br />(A) PROJECT MANAGER SHOULD DECIDE WHAT MUNICIPALITY HAS JURISDICTION OVER <br />EACH INDIVIDUAL JOB AND MEET WITH THIS INDIVIDUAL AT THE EARLIEST DATE TO <br />MAKE SURE THAT THE PERMITTING PROCESS WILL GO SMOOTHLY <br />(B) IDENTIFY ALL OF THE UTILITY PROVIDERS ON THE FACILITY AND MAKE SURE THEY <br />HAVE ADEQUATE TIME TO DISCONNECf SERVICE FROM THE STRUCTURE BEING <br />DEMOLISHED. SINCE THE TIME REQUIRED TO COMPLETE THIS PROCESS CAN BE <br />DIFFICULT TO QUANTIFY, IT IS EXTREMELY IMPORTANT THAT THE DISCONNECTION <br />PROCESS BEGINS AS SOON AS THE CONTRACTOR RECEIVES A NOTICE TO PROCEED <br />(C) REVIEW THE ENVIRONMENTAL SITE ASSESSMENTS FOR THE STRUCTURE AND MAKE <br />SURE THAT ALL HAZARDOUS MATERIALS ARE COMPLETELY REMOVED PRIOR TO <br />DEMOLITION COMMENCING <br />(D) SEND A TEN DAY NESHAPS TO THE RESPONSIBLE AGENCY BY CERTIFIED MAIL WITH <br />A COPY BEING SENT TO THE OWNER <br />
The URL can be used to link to this page
Your browser does not support the video tag.