<br />c <br /> <br />(E) REVIEW THE CONlRACT DOCUMENTS AND MAKE SURE THAT ALL APPROVALS ARE <br />IN PLACE AND THAT WE HAVE DUE AUTIIORIZATION TO PROCEED WITH THE WORK <br />(F) PERFORM A PRE-DEMO INSPECTION OF EACH WORK SITE TO MAKE SURE THE <br />ACTUAL WORK COINCIDES WITH THE CONTRACT DOCUMENTS, FILL OUT THE <br />ST ANDARD COMPANY JOB CHECK LIST AND MAKE SURE IT IS PLACED IN THE <br />PERMANENT JOB FILE <br />(G) DURING THE SITE VISIT LOOK FOR ANY PossmLE DANGEROUS SITUATIONS THAT <br />MAY BE ASSOCIATED WITH TIllS WORK. AND RELAY THESE CONCERNS TO THE <br />PROJECT SUPERINTENDENT AND OTHER TEAM MEMBERS (SUCH AS LOW HANGING <br />WIRES, GAS LINES, SEPTIC TANKS, TREE LIMBS, ETC,) <br />(H) OBSERVE HOW THE SITE IS SITUATED IN RELATION TO THE EXISTING ROADS AND <br />DEVISE A PLAN AS TO THE BEST HAUL ROlITE FOR ALL OF THE WASTE GENERATED <br />BY THE PROJECT AND BE ON THE LOOKOUT FOR SIDEWALKS, CURBS OR OTHER <br />ITEMS WHICH MAY NOT BE PART OF THE DEMOLITION BUT HAVE TO BE CROSSED TO <br />GET TO THE JOB SITE. IF THESE ITEMS ARE TO REMAIN AND NEED TO BE PROTECTED; <br />A PLAN TO ACHIEVE TIllS PROTECTION NEEDS TO BE DEVISED AND IMPLEMENIED <br />AND THE SUPERINTENDENT NEEDS TO BE MADE AWARE OF THE PLAN <br />(I) MAKE SURE THAT ALL CONCERNED PARTIES TO THE UPCOMING WORK ARE CLEARLY <br />IDENTIFIED AND ARE THROUGHL Y A WARE OF THE EXTENT AND OUTCOME OF ALL <br />UPCOMING DEMOLITION <br />(1) MONITOR THE PROGRESS OF THE WORK ON A DAILY BASIS; ONCE IT IS UNDERWAY <br />TO MAKE SURE THAT IT IS PROGRESSING ON SCHEDULE AND NO UNPLANNED RISKS <br />ARE BEING TAKEN <br />(K) MAKE SURE THAT A PLAN IS IN PLACE TO ASSURE THAT THE WORK SITE CAN BE <br />ADEQUATELY SECURED AND "SAFED OFF' TO PREVENT UNAUTHORIZED PERSONS <br />FROM ACCIDENTIALL Y ENIERING THE WORK AREA DURING OR AFrER WORK HOURS <br />(L) MAKE SURE THAT AN EROSION CONTROL PLAN IS FORMULATED AND PUT IN PLACE <br />TO ADEQUATELY CONfROL ANY EROSION AND RUNOFF THAT MAY BE CAUSED BY <br />THE DEMOLITION ACTIVITY <br />(M) MAKE SURE THERE IS AN ADEQUATE SOURCE OF WATER FOR "WET DEMOLITION" <br />(N) TRACK THE PROGRESS OF THE WORK ON A DAY TO DAY BASIS WITH AN EMPHASIS <br />ON ELIMINATING PROBLEMS BEFORE THEY OCCUR <br />(0) ONCE THE JOB IS COMPLETE, CONVEY THE BILLING INFORMATION TO THE OFFICE <br />STAFF FOR BILLING <br />(P) DO A FINAL INSPECfION OF THE SITE TO INSURE THAT ALL CONlRACT <br />REQUIREMENTS HAVE BEEN MET AND THE JOB IS TOT ALL Y COMPLETE. TRY TO <br />HAVE AN OWNERS REPRESENTATIVE TO INSPECf THE SITE AND VERIFY IT HAS BEEN <br />COMPLETED <br />(Q) REVIEW ALL BILLS OF LADING AND LANDFILL DOCUMENTS TO INSURE THAT ALL <br />WASTE WERE PROPERLY DISPOSED <br />(R) CALL FOR FINAL INSPECTIONS WITH RESPONsmLE GOVERNMENT AGENCIES <br /> <br />c <br /> <br />RESPONSIBLITIES OF THE JOB SUPERINTENDENT: <br /> <br />~ <br /> <br />(A) REVIEW THE CONlRACT WITH THE PROJECf MANAGER TO CLARIFY THE SCOPE AND <br />INTENT OF THE UPCOMING WORK <br />(B) REVIEW THE JOB CHECKLIST WITH THE PROJECT MANAGER TO MAKE SURE THAT <br />ALL ITEMS OF IMPORTANCE ARE BEING ADDRESSED <br />(C) INSTALL ALL EROSION CONTROL AND TREE BARRICADES <br />(D) REMOVE ANY FLUORESCENT BULBS, THERMOSTATS AND OTHERS MERCURY <br />CONTAINING DEVICES <br />(E) LOOK FOR ANY POTENTIAL JOBSITE HAZARDS NOT POINTED OUT BY THE PROJECT <br />MANAGER <br />(F) GO OVER THE SCOPE OF THE WORK WITH THE DEMOLITION EMPLOYEES <br />(G) CONDUCT A PRE-WORK. JOBSITE MEETING WITH ALL EMPLOYEES AND GENERAL <br />SAFETY AND SPECIFIC JOBSITE HAZARDS <br />