My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cross Construction Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Cross Construction Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2011 2:28:27 PM
Creation date
8/17/2011 2:27:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Demolition Services
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />c <br /> <br />(H) UNLOAD ALL EQUIPMENT AND INSPECT TO MAKE SURE THAT IT IS IN GOOD <br />WORKING ORDER AND THAT WE HAVE EVERYTHING WE NEED TO EXECUTE THE <br />WORK. <br />(1) DEMOLITION WILL COMMENCE IN A DELffiERATE AND CONTROLLED MANNER WORK <br />WILL PROCEED FROM TOP TO BOTTOM BY PROCESSING THE BUILDING INTO SMALL <br />PIECES THAT CAN BE SAFELY LOWERED TO THE GROUND OR PLACED IMMEDIATELY <br />IN TRUCKS FOR TRANSPORA TION TO THE LANDFILL OR RECYCLER <br />(1) MAKE SURE THAT MATERIAL IS THROUGHLY WET TO INSURE THAT NO FUGITIVE <br />DUST IS BEING GENERATED BY DEMOLmON ACTIVITIES <br />(K) VERIFY THAT ALL mUCKS ARE LOADED PROPERLY AND TIGHTLY T ARPED PRIOR TO <br />LEA VING THE JOB SITE <br />(L) MAKE SURE THAT NO UNAUTHORIZED PEOPLE ARE ALLOWED TO ENTER THE JOBSITE <br />WlllLE DEMO ACTIVITIES ARE UNDERWAY <br />(M) VERIFY THAT ALL EMPLOYEES ARE WEARING ALL NECESSARY SAFETY EQUIPMENT <br />(N) UPON COMPLETION OF THE REMOVAL OF THE BUILDINGS, FOUNDATIONS AND OTHER <br />ITEMS, THE SITE SHALL BE RAKED CLEAN AND LEVELED TO RESULTING GRADES. <br />NOTE: DO NOT LEAVE ANY HOLES, DIPS OR ANY OTHER TRIPPING HAZARDS AT THE <br />SITE <br />(0) THE SUPERVISOR WILL KEEP A DAILY WRITfEN LOG OF ALL JOB ACTIVITIES AND <br />TURN THE LOGS INTO THE OFFICE ON A WEEKLY BASIS OR UPON COMPLETION <br />WlllCHEVER OCCURS FIRST <br /> <br />c <br /> <br />ALWAYS REMEMBER!! NOTIllNG IS AS IMPORTANT AS THE SAFETY AND WELL BEING OF <br />OUR EMPLOYEES AND THE PROTECTION OF PROPERTY AT THE JOBSITE. SO NEVER TAKE <br />UNNECESSARY RISKS AND IF ANY TASK APPEARS TO PRESENT AN UNUSUAL RISK, CALL <br />TO DISCUSS THE SITUA nON WITH OTHER MEMBERS OF THE MANAGEMENT TEAM PRIOR <br />TO PROCEEDING, <br /> <br />c <br />
The URL can be used to link to this page
Your browser does not support the video tag.