My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ocean Bldg. Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Ocean Bldg. Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 10:09:15 AM
Creation date
8/23/2011 10:08:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Demolition Svcs
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />coordinated. <br /> <br />. <br /> <br />29. Can you just go ahead and set up the day? <br />Yes, ifthat is what you all want fall agreedl, okay so an Addendum will be prepared for <br />a specific date for th(~ 350 property. <br /> <br />. <br /> <br />I have to clarify that you have to request all the permits. \\'hen it comes to the City <br />permit, the City does re<luire that all properties be enclosed and that it has pollution <br />protection on the fencing. So make sure you incorporate that. The only fee that is <br />going to be waived is any fees that arc from the City. lfthere is a Miami-Dade County <br />fee, which there typically is, I think it is 60 cents on ever $1,000, that is still required to <br />be paid by the contractor. And so when you go pull a permit with the City there are <br />still some charges that might be there. The only fees that we waive are our own City <br />fees. The contractor will be required to pull all permits under his name, and to supply <br />all the necessary documentation for that permit. <br /> <br />. <br /> <br />30. Are you talking about the construction fence, the temporary fence? <br />All construction fencing shall have dust control. <br /> <br />. <br /> <br />. <br /> <br />31. The silt fence? <br />The silt fence will be required if and when, in \V ASD you have got the mangroves in the <br />back, yes the silt fences arc part of the NPDES requirements, which means that no <br />pollutant can leave the particular demolition site and go into the right-of-way, <br />everything has to be controlled on site. Contractor is responsible for all permit <br />requirements and conditions. <br /> <br />. <br /> <br />32. I believe that Sunny Isles Boulevard and all the surrounding streets are higher than the grade <br />of the parking lot, and so it wouldn't make any sense to put a fence around it plus the cost for <br />trenching through asphalt for fencing would be astronomical, it just doesn't make sense and <br />he would ask that that requirement be waived? <br />We can't waive the NPDES requirements, and so "hen you pull the permit and the <br />NPDES issue does come up then it will be a requirement, if it doesn't. then it is not. I <br />can tell you based on my knowledge that all the pollutants must be controlled on site. <br /> <br />It <br /> <br />33. In the event that there is asbestos in the building, tie it in with any cost for abatement? <br />\\'hatever the asbestos report comes in and says abatement, will be time and material. <br />All you will be including on your pricr is drmolition as you regularly drmolish, and the <br />asbestos report. \Vhen the rrcommendation comes in from the asbestos company if <br />they do find asbestos in it, then we have to develop a plan that is going to be amicable <br />for all to remo\'C it. Any abatement shall be based on asbestos report and shall be paid <br />for on a time and material basis upon rniew by the City. <br /> <br />. <br /> <br />. <br /> <br />34. Is the City going to cap the water and the sewer or is that our responsibility? <br />:\0. This is the Contractor's responsibility. \\ hen you pull the permit \\ith the City of <br />Sunny Isles Beach. you will have to have the notices all clear from all TECn. C\\lB <br />(City of;\orth 'Iiami Beach) for the utilities, FPL and AT& I, and you arc responsible <br />for that. <br /> <br />. <br /> <br />11-07 -03 Pre-Submittal Conference Qi\ 072011.doc <br /> <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.